Seismic Displacement Assessment of New Facilities for Post-Disaster Operation at a Wastewater Treatment Plant

被引:0
|
作者
Ghandeharioon, Ali [1 ]
Port, Andrew [1 ]
机构
[1] Klohn Crippen Berger Ltd, Vancouver, BC, Canada
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
New developments are planned at an existing wastewater treatment plant, which provides secondary treatment of the liquid stream for about one million residents and businesses. Existing facilities at the 45-year old plant were designed based on various versions of the building code in effect at the time of construction, and each expansion was designed to a different level of seismic performance. As part of the new expansion phase, additional gravity thickeners are proposed in an area of the site surrounded by several older facilities. The proposed gravity thickeners are designed for post-disaster operation after the design earthquake without adversely affecting the performance of the existing facilities. A suite of 15 spectrally matched ground motions were developed for the 2,475 year design return period, and nonlinear seismic deformation analyses were performed using the finite difference program FLAC and effective stress-based constitutive model UBCSAND. As per conventional local practice, time histories representing the average and upper bound estimates of the Arias intensity and significant duration were identified from the 15 earthquakes during preliminary design, and seismic-induced displacements of the facilities were evaluated. Subsequently, the performance of the structures was assessed under all 15 time histories. The analyses showed that the initial selection of time histories based on the average and upper bound Arias intensity and significant duration did not correspond to the average and upper bound displacements under all 15 time histories. It is evident that conventional selection of earthquake records may not result in the examination of the most critical displacement cases.
引用
收藏
页码:225 / 233
页数:9
相关论文
共 50 条
  • [1] Logistic processes in a post-disaster relief operation
    Garcia Bastos, Maria Aparecida
    Gouvea Campos, Vania Barcellos
    de Mello Bandeira, Renata Albergaria
    TRANSPORTATION: CAN WE DO MORE WITH LESS RESOURCES? - 16TH MEETING OF THE EURO WORKING GROUP ON TRANSPORTATION - PORTO 2013, 2014, 111 : 1175 - 1184
  • [2] Post-disaster assessment routing problem
    Oruc, Buse Eylul
    Kara, Bahar Yetis
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2018, 116 : 76 - 102
  • [3] Post-disaster assessment in Brazzaville, Congo
    Mbopi-Keou, Francois-Xavier
    LANCET INFECTIOUS DISEASES, 2012, 12 (05): : 363 - 364
  • [4] CARE: Public Post-Disaster Emergency Aid Facilities for Victims
    Siu, Kin Wai Michael
    SAGE OPEN, 2016, 6 (01):
  • [5] The Project PRISMA: Post-Disaster Assessment with UAVs
    Recchiuto, Carmine Tommaso
    Sgorbissa, Antonio
    INTELLIGENT AUTONOMOUS SYSTEMS 14, 2017, 531 : 199 - 211
  • [6] Global or local construction materials for post-disaster reconstruction? Sustainability assessment of 20 post-disaster shelter designs
    Escamilla, E. Zea
    Habert, G.
    DATA IN BRIEF, 2015, 4 : 308 - 314
  • [7] Global or local construction materials for post-disaster reconstruction? Sustainability assessment of twenty post-disaster shelter designs
    Escamilla, E. Zea
    Habert, G.
    BUILDING AND ENVIRONMENT, 2015, 92 : 692 - 702
  • [8] Risk Assessment and Sustainability of Wastewater Treatment Plant Operation
    Tuser, Irena
    Oulehlova, Alena
    SUSTAINABILITY, 2021, 13 (09)
  • [9] Grant awarded for post-disaster treatment center
    不详
    PSYCHIATRIC ANNALS, 2004, 34 (08) : 586 - 586
  • [10] Response to "Post-Disaster Planning in New Orleans"
    Thompson, J. Phillip
    JOURNAL OF PLANNING EDUCATION AND RESEARCH, 2009, 28 (03) : 403 - 404