Model Based Control of a Full-Scale Biological Wastewater Treatment Plant

被引:9
|
作者
Tejaswini, E. S. S. [1 ]
Panjwani, Soniya [1 ]
Babu, G. Uday Bhaskar [1 ]
Rao, A. Seshagiri [1 ]
机构
[1] Natl Inst Technol, Dept Chem Engn, Warangal 506004, Andhra Pradesh, India
来源
IFAC PAPERSONLINE | 2020年 / 53卷 / 01期
关键词
Benchmark Simulation Model No.2; Effluent Quality Index; Fuzzy controller; MPC; Operational Cost Index; CONTROL STRATEGIES;
D O I
10.1016/j.ifacol.2020.06.036
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the present contribution, different combinations of control strategies based on PI, MPC and Fuzzy controllers are implemented with a prime concern of improving the quality of the discharge and reducing the operational expenditure in a full scale wastewater treatment plant. The Benchmark Simulation Model No.2 (BSM2) is used as the working platform. The control objective is to maintain the dissolved oxygen concentration in the fourth tank by manipulating the oxygen transfer coefficients of third, fourth and fifth tanks in the biological wastewater treatment. PI and MPC are used at the lower level whereas MPC and Fuzzy controllers are used at the higher level. The effluent violations are reduced for all the proposed control schemes. It is also observed that PI-MPC results in best Effluent Quality Index (EQI) and PI -Fuzzy results in best Operational Cost Index (OCI). (C) 2020, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:208 / 213
页数:6
相关论文
共 50 条
  • [1] Full-scale implementation of an advanced control system on a biological wastewater treatment plant
    Midas, Michela
    Corona, Francesco
    Sirvio, Jukka
    Hyvonen, Seppo
    Vahala, Riku
    [J]. IFAC PAPERSONLINE, 2016, 49 (07): : 1163 - 1168
  • [2] Results of a Full-Scale Model of a Macrophyte Wastewater Treatment Plant
    Ruiz Lozano, Oscar
    Acero Oliete, Alejandro
    Lopez Julian, Pedro
    Russo, Beniamino
    [J]. PROCEEDINGS OF THE 39TH IAHR WORLD CONGRESS, 2022, : 1989 - 1993
  • [3] Optimization of a full-scale Unitank wastewater treatment plant for biological phosphorus removal
    Zhou, Zhen
    Xing, Can
    Wu, Zhichao
    Tong, Fei
    Wang, Junru
    [J]. ENVIRONMENTAL TECHNOLOGY, 2014, 35 (06) : 766 - 772
  • [4] Biological Phosphorus Removal Characteristics in a Full-scale Unitank Wastewater Treatment Plant
    Zhou, Zhen
    Shao, Wenrui
    Xing, Can
    Li, Zheng
    Guan, Pengqiong
    Zhou, Tao
    Wei, Zichao
    [J]. PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING, PTS 1-4, 2013, 610-613 : 1696 - 1700
  • [5] Application of machine learning techniques to model a full-scale wastewater treatment plant with biological nutrient removal
    Zaghloul, Mohamed Sherif
    Achari, Gopal
    [J]. JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING, 2022, 10 (03):
  • [6] THE FULL-SCALE TREATMENT PLANT FOR DECOLOURISATION OF DYE WASTEWATER
    Barbusinski, Krzysztof
    [J]. ARCHITECTURE CIVIL ENGINEERING ENVIRONMENT, 2009, 2 (02) : 89 - 94
  • [7] Calibration of a complex activated sludge model for the full-scale wastewater treatment plant
    Ewa Liwarska-Bizukojc
    Dorota Olejnik
    Rafal Biernacki
    Stanislaw Ledakowicz
    [J]. Bioprocess and Biosystems Engineering, 2011, 34 : 659 - 670
  • [8] Calibration of a complex activated sludge model for the full-scale wastewater treatment plant
    Liwarska-Bizukojc, Ewa
    Olejnik, Dorota
    Biernacki, Rafal
    Ledakowicz, Stanislaw
    [J]. BIOPROCESS AND BIOSYSTEMS ENGINEERING, 2011, 34 (06) : 659 - 670
  • [9] Enhancement of biological nutrient removal process with advanced process control tools in full-scale wastewater treatment plant
    Palatsi, Jordi
    Ripoll, Ferran
    Benzal, Albert
    Pijuan, Maite
    Romero-Guiza, Maycoll Stiven
    [J]. WATER RESEARCH, 2021, 200
  • [10] Economic Model Predictive Control of Aeration Systems in a Full Scale Biological Wastewater Treatment Plant
    Nejjari, F.
    Puig, V.
    Quevedo, J.
    Pascual, J.
    de Campos, S.
    [J]. 27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2017, 40B : 1579 - 1584