The Construction and Use of Liability Operation Evaluation System

被引:0
|
作者
Yang Chunli [1 ]
Peng Zhao [1 ]
Li Qiong [1 ]
机构
[1] NE Normal Univ, Sch Business, Changchun 130117, Peoples R China
关键词
liability operation; controllability; system construction;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
With the development of economy in our country, companies are looking for strong operation mode on the basis of the abundant fund. At present, by national macroeconomic policy, the enterprise itself capital efficiency and malicious use of funds, enterprise funds supply very nervous. Enterprise wants to normal operations with its own financial strength alone is not enough. The lack of its own funds hindered the pace of enterprise development, so operation on borrowing become the only way for enterprise development. In this paper, through analyzing the building of liability operation system and the use, find out a set of liability operation on the controllable system, enables the enterprise to be good under the system of operation on borrowing.
引用
收藏
页码:622 / 627
页数:6
相关论文
共 50 条
  • [1] LIABILITY PROBLEMS AT THE PLANNING, CONSTRUCTION AND OPERATION OF ENERGY-ENGINEERING PLANTS
    POOS, B
    BRENNSTOFF-WARME-KRAFT, 1994, 46 (03): : 91 - 94
  • [2] Operation Performance Comprehensive Evaluation of Execution Control System in Freeway Construction Project
    Tu, Zhengyu
    Qu, Na
    Li, Luxiong
    Lu, Yang
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 3080 - 3083
  • [3] Operation Risk Structural Analysis and Evaluation System Construction for Multistation Integration Project
    Cui, Weiwei
    Liu, Pingkuo
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [4] Construction of Compulsory Environmental Liability Insurance System in China
    Zhong Hongfei
    Song Pingfan
    PROCEEDINGS OF 2013 CHINA INTERNATIONAL CONFERENCE ON INSURANCE AND RISK MANAGEMENT, 2013, : 560 - 567
  • [5] Construction and operation of a registration system in a university
    Higaki, Yasuhiko
    Ayuha, Tsutomu
    Tutiya, Syun
    Systems and Computers in Japan, 2006, 37 (10): : 69 - 80
  • [6] CONSTRUCTION AND OPERATION OF ORE YARD SYSTEM
    YAMANA, SI
    KANEDA, T
    OBATA, H
    NAKAYAMA, F
    SEGAWA, Y
    MIYASAKI, Y
    TRANSACTIONS OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 24 (12) : B371 - B371
  • [7] Evaluation Index System Construction for Diversified Business Operation - Case Study of P Company
    Chi, Jian
    Zhao, Renqian
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MANAGEMENT, EDUCATION, INFORMATION AND CONTROL, 2015, 125 : 901 - 905
  • [9] CONSTRUCTION AND INITIAL OPERATION OF A PROPORTIONAL WIRE DETECTOR FOR USE IN A CERENKOV RING IMAGING-SYSTEM
    VAVRA, J
    BIENZ, T
    BIRD, F
    GAILLARD, M
    HALLEWELL, G
    KWON, YJ
    LEITH, D
    RATCLIFF, B
    RENSING, P
    SCHULTZ, D
    SHAPIRO, S
    TOGE, N
    CAVALLISFORZA, M
    COYLE, P
    COYNE, D
    WILLIAMS, D
    CALDWELL, D
    LU, A
    YELLIN, S
    JOHNSON, R
    MEADOWS, B
    NUSSBAUM, M
    PLANO, R
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1988, 35 (01) : 487 - 492
  • [10] A SYSTEM OF CONSTRUCTION AND OPERATION OF PACKETS OF APPLIED PROGRAMS
    BEZHANOVA, MM
    MOSKVINA, LA
    PROGRAMMING AND COMPUTER SOFTWARE, 1982, 8 (02) : 93 - 97