Process modification of Total Site Heat Integration profile for capital cost reduction

被引:19
|
作者
Chew, Kew Hong [1 ]
Klemes, Jiri Jaromir [2 ]
Alwi, Sharifah Rafidah Wan [1 ]
Manan, Zainuddin Abdul [1 ]
机构
[1] Univ Teknol Malaysia, Proc Syst Engn Ctr PROSPECT, Fac Chem Engn, Utm Johor Bahru 81310, Johor, Malaysia
[2] Univ Pannonia, Fac Informat Technol, CPI2, H-8200 Veszprem, Hungary
关键词
Total Site Heat Integration; Pinch analysis; Total Site Profile directed approach; Process modifications; Extended keep hot stream hot and keep; cold stream cold principles; Capital cost reduction; PINCH TECHNOLOGY; ENERGY; RECOVERY; METHODOLOGY; FUEL;
D O I
10.1016/j.applthermaleng.2015.02.064
中图分类号
O414.1 [热力学];
学科分类号
摘要
The Total Site Profile (TSP) can be a powerful tool to evaluate the potential for further Heat Integration improvement for a Total Site (TS). A systematic Total Site Heat Integration (TSHI) methodology to target decreasing the capital cost of heat transfer units at Total Sites has been developed. The methodology includes a set heuristics that have been developed to identify and prioritise the strategic process changes to apply, as a result of changes in the TSP shape. The TSP and expanded Total Site Problem Table Algorithm (TS-PTA) can provide useful insights for the plant designers to identify "where", in terms of which temperature interval, and which streams within the entire TS to focus the process modification efforts. The keep hot stream hot (KHSH) and keep cold stream cold (KCSC) principles can be applied to favourably change the TSP shape to provide a larger temperature driving force to further reduce the HTA and capital costs. In one of the case study, the application of KHSH and KCSC on TSP increases the temperature driving force between the medium pressure steam utility and process resulting in a reduction of 3,827 m(2) heat transfer area (HTA) and a saving of 10% in heat exchangers cost. The proposed changes to the selected streams should be assessed from feasibility, practicality and economic perspectives. The selected and potentially acceptable process modification options can be conveniently merged with potential retrofit project (e.g. to increase plant capacity) considered for the Total Site. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1023 / 1032
页数:10
相关论文
共 50 条
  • [1] Process Modification for Capital Cost Reduction in Total Site Heat Integration
    Chewa, Kew Hong
    Klemes, Jiri Jaromir
    Alwi, Sharifah Rafidah Wan
    Manan, Zainuddin Abdul
    [J]. PRES 2014, 17TH CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, PTS 1-3, 2014, 39 : 1429 - +
  • [2] Process Modification Potentials for Total Site Heat Integration
    Chew, Kew Hong
    Alwi, Sharifah Rafidah Wan
    Klemes, Jiri Jaromir
    Manan, Zainuddin Abdul
    [J]. 16TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION (PRES'13), 2013, 35 : 175 - 180
  • [3] Capital Cost Targeting of Total Site Heat Recovery
    Nemet, Andreja
    Varbanov, Petar Sabev
    Kapustenko, Petro
    Durgutovic, Anes
    Klemes, Jiri Jaromir
    [J]. CISAP5: INTERNATIONAL CONFERENCE ON SAFETY & ENVIRONMENT IN PROCESS & POWER INDUSTRY, PT 1, 2012, 26 : 231 - 236
  • [4] Capital Cost Targeting of Total Site Heat Recovery
    Nemet, Andreja
    Boldyryev, Stanislav
    Varbanov, Petar Sabev
    Kapustenko, Petro
    Klemes, Jiri Jaromir
    [J]. PRES 2012: 15TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2012, 29 : 1447 - 1452
  • [5] Cost Effective Heat Exchangers Network of Total Site Heat Integration
    Boldyryev, Stanislav
    Krajacic, Goran
    Duic, Neven
    [J]. PRES2016: 19TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELING AND OPTIMIZATION FOR ENERGY SAVINGS AND POLLUTION REDUCTION, 2016, 52 : 541 - 546
  • [6] Total site mass, heat and power integration using process integration and process graph
    Ong, Benjamin H. Y.
    Walmsley, Timothy G.
    Atkins, Martin J.
    Walmsley, Michael R. W.
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 167 : 32 - 43
  • [7] Process modifications to maximise energy savings in total site heat integration
    Chew, Kew Hong
    Kleme, Jiri Jaromir
    Alwi, Sharifah Rafidah Wan
    Manan, Zainuddin Abdul
    [J]. APPLIED THERMAL ENGINEERING, 2015, 78 : 731 - 739
  • [8] On the use of heat pumps in total site heat integration
    Bagajewicz, MJ
    Barbaro, AF
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2003, 27 (11) : 1707 - 1719
  • [9] Capital Cost Assessment for Total Site Power Cogeneration
    Boldyryev, Stanislav
    Varbanov, Petar Sabev
    Nemet, Andreja
    Klemes, Jiri Jaromir
    Kapustenko, Petro
    [J]. 23 EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2013, 32 : 361 - 366
  • [10] Multiple plant heat integration in a total site
    Bagajewicz, M
    Rodera, H
    [J]. AICHE JOURNAL, 2002, 48 (10) : 2255 - 2270