共 50 条
- [1] Process Modification for Capital Cost Reduction in Total Site Heat Integration [J]. PRES 2014, 17TH CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, PTS 1-3, 2014, 39 : 1429 - +
- [2] Process Modification Potentials for Total Site Heat Integration [J]. 16TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION (PRES'13), 2013, 35 : 175 - 180
- [3] Capital Cost Targeting of Total Site Heat Recovery [J]. CISAP5: INTERNATIONAL CONFERENCE ON SAFETY & ENVIRONMENT IN PROCESS & POWER INDUSTRY, PT 1, 2012, 26 : 231 - 236
- [4] Capital Cost Targeting of Total Site Heat Recovery [J]. PRES 2012: 15TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2012, 29 : 1447 - 1452
- [5] Cost Effective Heat Exchangers Network of Total Site Heat Integration [J]. PRES2016: 19TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELING AND OPTIMIZATION FOR ENERGY SAVINGS AND POLLUTION REDUCTION, 2016, 52 : 541 - 546
- [9] Capital Cost Assessment for Total Site Power Cogeneration [J]. 23 EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2013, 32 : 361 - 366
- [10] Multiple plant heat integration in a total site [J]. AICHE JOURNAL, 2002, 48 (10) : 2255 - 2270