Health and Safety Analysis of Light Rail Transit Projects in Palembang

被引:0
|
作者
Aji, Gafo Rudy Hendrik [1 ]
Putranto, Dinar D. A. [1 ]
Juliantina, Ika [1 ]
机构
[1] Sriwijaya Univ, Fac Engn, Dept Civil Engn, Palembang, Indonesia
关键词
D O I
10.1088/1742-6596/1198/8/082017
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Several sports in the XVIII Asian Games will be held in Palembang city in 2018. To support activities and facilities it is necessary to support such buildings as Light Rail Transit (LRT). The city government of Palembang targets LRT construction to operate in June 2018 with a total length of 23.4 km and a 12 meter LRT road width for two lines. PT. Waskita Karya (Persero) Tbk as the implementation of LRT project development. In an effort to prevent or reduce accidents on the required development an occupational safety and health program (K3). The purpose of this study is to calculate the frequency and impact of OHS risk on the Light Rail Transit (LRT) project in Palembang. This research uses field observation and interview method, and conducting assessment based on risk assessment matrix from AS / NZS 4360: 2004 risk management standard. Matrix risk assessment methods derived from Australian Standards / New Zaeland Standards (AS / NZS) 4360: 2004 and ISO 31000: 2009. From 60 variables that have been tested previously obtained 78 factors in group L (low), 18 factors in the group Medium (M) and as many as 4 factors in group H (high).
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Analysis of Transit Oriented Development Potential on Light Rail Transit Palembang, Simpang Polda Station Area
    Fajri, Fadhil Muhammad
    Sumabrata, Jachrizal
    2018 6TH INTERNATIONAL CONFERENCE ON TRAFFIC AND LOGISTIC ENGINEERING (ICTLE 2018), 2019, 259
  • [2] Lightning Protection System for Light Rail Transit Case on Palembang, Indonesia
    Denov, Bryan
    Zoro, Reynaldo
    2018 4TH IEEE CONFERENCE ON POWER ENGINEERING AND RENEWABLE ENERGY (ICPERE 2018), 2018, : 221 - 226
  • [3] The light rail transit safety experience
    Farran, JI
    Korve, HW
    Levinson, HS
    Mansel, DM
    TRAFFIC CONGESTION AND TRAFFIC SAFETY IN THE 21ST CENTURY: CHALLENGES, INNOVATIONS, AND OPPORTUNITIES, 1997, : 97 - 103
  • [4] The Analysis of Ability to Pay (ATP) and Willingness to Pay (WTP) on Light Rail Transit (LRT) Tariff in Palembang
    Sarwandy, M. H. A.
    Arliansyah, Joni
    Fitriani, Heni
    SYMPOSIUM OF EMERGING NUCLEAR TECHNOLOGY AND ENGINEERING NOVELTY (SENTEN 2018), 2019, 1198
  • [5] Political risk in light rail transit PPP projects
    Smith, N. J.
    Gannon, M.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2008, 161 (04) : 179 - 185
  • [6] Light Rail Transit in Hamilton: Health, Environmental and Economic Impact Analysis
    P. Topalovic
    J. Carter
    M. Topalovic
    G. Krantzberg
    Social Indicators Research, 2012, 108 : 329 - 350
  • [7] Light Rail Transit in Hamilton: Health, Environmental and Economic Impact Analysis
    Topalovic, P.
    Carter, J.
    Topalovic, M.
    Krantzberg, G.
    SOCIAL INDICATORS RESEARCH, 2012, 108 (02) : 329 - 350
  • [8] The light rail transit safety experience in North America
    Farrán, JI
    URBAN TRANSPORT AND THE THE ENVIRONMENT FOR THE 21ST CENTURY IV, 1998, 4 : 43 - 52
  • [9] Light Rail Transit Urban Insertion and Safety European Experience
    Novales, Margarita
    Teixeira, Manuel
    Fontaine, Laetitia
    TRANSPORTATION RESEARCH RECORD, 2014, (2419) : 63 - 81
  • [10] Pedestrian safety at intersections near light rail transit stations
    Pulugurtha, Srinivas S.
    Srirangam, L. Prasanna
    PUBLIC TRANSPORT, 2022, 14 (03) : 583 - 608