Study of common wear prediction models for hard rock TBM disc cutters and comparison with field observation in Kerman water conveyance tunnel

被引:11
|
作者
Karami, Morteza [1 ]
Zare, Shokrollah [1 ]
Rostami, Jamal [2 ]
机构
[1] Shahrood Univ Technol, Fac Min Petr & Geophys Engn, Shahrood, Iran
[2] Colorado Sch Mines, Earth Mech Inst, Dept Min Engn, Golden, CO 80401 USA
关键词
Disc cutter lifetime; Normal wear; Empirical prediction model; Rock mass strength;
D O I
10.1007/s10064-020-01987-5
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Disc cutters are the most commonly used cutting tools in the hard rock tunneling by tunnel boring machines (TBMs). During operation of a TBM in any project, disc cutters wear out and should be replaced to maintain high machine performance. This is especially true in very strong and abrasive rocks. In the process of planning and estimation of completion time and cost for a given tunneling project, the lifetime of the disc cutter is often predicted using the empirical models due to their simplicity and availability. But understanding the background of the models and the relative difference between both predicted and actual lifetimes is critical for improving the accuracy of estimated cutter life. In this study, the basis and input parameters of the most frequently used empirical models for prediction of disc wear life are examined. The result of estimating cutter life by using these models is compared in similar working conditions, including TBM specifications, operating conditions, and rock abrasivity. The results show that in slightly abrasive rocks, the empirical models should be carefully chosen, because the estimated disc life may spread over a wide range. Furthermore, some models are very conservative, while others offer more compatible estimates with the rock abrasivity. Also, in the Kerman water conveyance tunnel, the predicted and actual cutter lives show good correlation with the ratio of the rock mass and intact rock strengths, in addition to laboratory measures of rock abrasivity.
引用
收藏
页码:1467 / 1476
页数:10
相关论文
共 49 条
  • [1] Study of common wear prediction models for hard rock TBM disc cutters and comparison with field observation in Kerman water conveyance tunnel
    Morteza Karami
    Shokrollah Zare
    Jamal Rostami
    [J]. Bulletin of Engineering Geology and the Environment, 2021, 80 : 1467 - 1476
  • [2] Tracking of disc cutter wear in TBM tunneling: a case study of Kerman water conveyance tunnel
    Karami, Morteza
    Zare, Shokrollah
    Rostami, Jamal
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (01) : 201 - 219
  • [3] Tracking of disc cutter wear in TBM tunneling: a case study of Kerman water conveyance tunnel
    Morteza Karami
    Shokrollah Zare
    Jamal Rostami
    [J]. Bulletin of Engineering Geology and the Environment, 2021, 80 : 201 - 219
  • [4] Development of a prediction model for the wear evolution of disc cutters on rock TBM cutterhead
    Wang, Lihui
    Li, Haipeng
    Zhao, Xiangjun
    Zhang, Qian
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 67 : 147 - 157
  • [5] Introducing an empirical model for prediction of disc cutter life for TBM application in jointed rocks: case study, Kerman water conveyance tunnel
    Karami, Morteza
    Zare, Shokrollah
    Rostami, Jamal
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (05) : 3853 - 3870
  • [6] Introducing an empirical model for prediction of disc cutter life for TBM application in jointed rocks: case study, Kerman water conveyance tunnel
    Morteza Karami
    Shokrollah Zare
    Jamal Rostami
    [J]. Bulletin of Engineering Geology and the Environment, 2021, 80 : 3853 - 3870
  • [7] Wear and consumption of large diameter disc cutters for hard rock TBM under giant porphyritic granite
    Du, Li-Jie
    Ji, Shan-Shan
    Zuo, Li-Fu
    Kong, Hai-Xia
    Xu, Jin-Lin
    Du, Yan-Liang
    [J]. Meitan Xuebao/Journal of the China Coal Society, 2015, 40 (12): : 2974 - 2978
  • [8] Analysis of Grinding and Chipping Processes beneath Disc Cutters of Hard Rock Tunnel Boring Machines (Case study: Uma-Oya water Conveyance Tunnel, SriLanka)
    Pourhashemi, Seyed Mandi
    Ahangari, Kaveh
    Hassanpour, Jafar
    Eftekhari, Seyed Mosleh
    [J]. JOURNAL OF MINING AND ENVIRONMENT, 2021, 12 (01): : 281 - 297
  • [9] Estimation of Rock Mass Squeezing Potential in Tunnel Route (Case Study: Kerman Water Conveyance Tunnel)
    Azizi, Farshad
    Koopialipoor, Mohammadreza
    Khoshrou, Hasan
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (03) : 1671 - 1685
  • [10] Disc cutter wear prediction for a hard rock TBM cutterhead based on energy analysis
    Wang, Lihui
    Kang, Yilan
    Zhao, Xiangjun
    Zhang, Qian
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 50 : 324 - 333