Six problems with the 6-day Curie and a solution

被引:4
|
作者
Paterson, Adi [1 ]
Druce, Michael [1 ]
Killen, Elizabeth [1 ]
机构
[1] ANSTO, Lucas Heights, NSW 2444, Australia
关键词
Molybdenum; Mo-99; 6-day Curie; Supply chain; Full cost recovery; NEA; HLG-MR;
D O I
10.1007/s10967-015-4050-4
中图分类号
O65 [分析化学];
学科分类号
070302 ; 081704 ;
摘要
In this review the major shortfalls of the unit of sale for the Mo-99 supply chain-the 6-day Curie-are identified and discussed. These include its status as an inconsistent, out-dated, non-SI unit, and its use causing propagation of inefficient logistics within the Mo-99 supply chain. An alternative Mo-99 unit of sale is proposed: Becquerels time-stamped at the Port of Despatch. Adoption of the new unit is proposed as a catalyst in the move away from the current economically unsustainable, Mo-99 supply chain in favour of simplicity, self-regulation, transparency, efficiency, and full-cost recovery in line with High-Level Group for the Security of Supply of Medical Radioisotopes recommendations.
引用
收藏
页码:13 / 22
页数:10
相关论文
共 50 条