Modelling and optimizing sequential imperfect preventive maintenance

被引:56
|
作者
Bartholomew-Biggs, Michael [1 ]
Zuo, Ming J. [2 ]
Li, Xiaohu [3 ]
机构
[1] Univ Hertfordshire, Sch Phys Astron & Math, Hatfield AL10 9AB, Herts, England
[2] Univ Alberta, Dept Mech Engn, Edmonton, AB T6G 2G8, Canada
[3] Lanzhou Univ, Sch Math & Stat, Lanzhou 730000, Peoples R China
关键词
Cost rate; Effective age; Failure mode; Failure rate; Imperfect preventive maintenance; Optimization; REPLACEMENT; POLICIES;
D O I
10.1016/j.ress.2008.03.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with the problem of scheduling imperfect preventive maintenance (PM) of some equipment. It uses a model due to Kijima in which each application of PM reduces the equipment's effective age (but without making it as good as new). The approach presented here involves minimizing a performance function which allows for the costs of minimal repair and eventual system replacement as well as for the costs of PM during the equipment's operating lifetime. The paper describes a numerical investigation into the sensitivity of optimum schedules to different aspects of an age-reduction model (including the situation when parts of a system are non-maintainable-i.e., unaffected by PM). (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:53 / 62
页数:10
相关论文
共 50 条
  • [1] Optimizing sequential imperfect preventive maintenance for equipment in life cycle
    Kuang Yuanhui
    Miao Qiang
    Huang Hongzhong
    Liu Yu
    Liu Zhijie
    [J]. Proceedings of the First International Conference on Maintenance Engineering, 2006, : 242 - 249
  • [2] SEQUENTIAL IMPERFECT PREVENTIVE MAINTENANCE POLICIES
    NAKAGAWA, T
    [J]. IEEE TRANSACTIONS ON RELIABILITY, 1988, 37 (03) : 295 - 298
  • [3] Modelling and Analysis of Maintenance Contract with Imperfect Preventive Maintenance
    Husniah, H.
    Cakravastia, A.
    Iskandar, B. P.
    Pasaribu, U. S.
    [J]. 2015 INTERNATIONAL CONFERENCE ON TECHNOLOGY, INFORMATICS, MANAGEMENT, ENGINEERING & ENVIRONMENT (TIME-E), 2015, : 25 - 30
  • [4] An Extended Sequential Imperfect Preventive Maintenance Model with Improvement Factors
    Sheu, Shey-Huei
    Chang, Chin-Chih
    Chen, Yen-Luan
    [J]. COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2012, 41 (07) : 1269 - 1283
  • [5] SEQUENTIAL IMPERFECT PREVENTIVE MAINTENANCE POLICIES - A CASE-STUDY
    JAYABALAN, V
    CHAUDHURI, D
    [J]. MICROELECTRONICS AND RELIABILITY, 1992, 32 (09): : 1223 - 1229
  • [6] Modelling and optimizing imperfect maintenance of coatings on steel structures
    Nicolai, R. P.
    Frenk, J. B. G.
    Dekker, R.
    [J]. STRUCTURAL SAFETY, 2009, 31 (03) : 234 - 244
  • [7] Sequential imperfect preventive maintenance policy with random maintenance quality under reliability limit
    Wang, Z.
    Yang, J.
    Wang, G.
    Zhang, G.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2011, 225 (C8) : 1926 - 1935
  • [8] Periodic and Sequential Imperfect Preventive Maintenance Policies for Cumulative Damage Models
    Nakagawa, Toshio
    Mizutani, Satoshi
    [J]. RECENT ADVANCES IN RELIABILITY AND QUALITY IN DESIGN, 2008, : 85 - 99
  • [9] Sequential imperfect preventive maintenance models with two categories of failure modes
    Lin, DM
    Zuo, MJ
    Yam, RCM
    [J]. NAVAL RESEARCH LOGISTICS, 2001, 48 (02) : 172 - 183
  • [10] Optimum sequential preventive maintenance first or last policies with imperfect maintenance for a system subject to shocks
    Chen, Yen-Luan
    Chang, Chin-Chih
    [J]. COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2022, 51 (01) : 162 - 178