Performance assessment of the phased remediation of a former gas manufacturing plant

被引:0
|
作者
Shields, ARG [1 ]
Jones, A [1 ]
Mason, J [1 ]
Smith, S [1 ]
Butler, A [1 ]
Wheater, H [1 ]
Bell, N [1 ]
机构
[1] Komex, Bristol, Avon, England
来源
关键词
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The remediation of a former manufactured gas plant (MGP) in the north of England is the subject of both a commercial remediation project and an ongoing collaborative research programme. A risk-based remediation strategy has been adopted, which involved an initial risk assessment to identify appropriate cleanup criteria and removal of primary sources. This was followed by remedial technology pilot testing, and the installation and monitoring of a full scale in-situ air sparging system. This system is currently operational. Periodic measurements of dissolved organic and inorganic components, and highly detailed time series of temperature, Eh, pH, dissolved oxygen and piezometry have been obtained for the sparge system. Naphthalene degradative activities have been assessed through the application of Filters for the Recovery of Organisms from Groundwater Samples (FROGS). Integration and interpretation of the data is undertaken using a biogeochemical groundwater model. Significant reductions in dissolved phase hydrocarbons are being achieved within and downgradient of the aeration zone. Integration of laboratory challenge tests for hydrocarbon mineralisation rates with in-situ measurements from the sparge system have demonstrated the response of the subsurface environment to the changes in redox conditions following the introduction of the sparge barrier. These results also provide guidance on the long-term effectiveness of the sparge barrier.
引用
收藏
页码:123 / 129
页数:7
相关论文
共 50 条
  • [1] Performance assessment of the phased remediation of a former gas manufacturing plant
    Butler, AP
    Shields, A
    Wheater, HS
    Bell, JNB
    Mason, JR
    Smith, S
    Jones, ADG
    [J]. GROUNDWATER QUALITY: NATURAL AND ENHANCED RESTORATION OF GROUNDWATER POLLUTION, 2002, (275): : 353 - 359
  • [2] Case history: Reclamation of a former manufacturing gas plant
    Di Leo, C
    Barbaro, A
    Bittoni, A
    Colapietro, P
    Fabiani, F
    Robertiello, A
    [J]. BIOREMEDIATION TECHNOLOGIES FOR POLYCYCLIC AROMATIC HYDROCARBON COMPOUNDS, 1999, : 129 - 133
  • [3] Toxicity assessment of a former manufactured gas plant
    Ferguson, AS
    Doherty, R
    Larkin, MJ
    Kalin, RM
    Irvine, V
    Ofterdinger, US
    [J]. BULLETIN OF ENVIRONMENTAL CONTAMINATION AND TOXICOLOGY, 2003, 71 (01) : 21 - 30
  • [4] Toxicity Assessment of a Former Manufactured Gas Plant
    A. S. Ferguson
    R. Doherty
    M. J. Larkin
    R. M. Kalin
    V. Irvine
    U. S. Ofterdinger
    [J]. Bulletin of Environmental Contamination and Toxicology, 2003, 71 : 0021 - 0030
  • [5] Friends or foes? Monetized Life Cycle Assessment and Cost-Benefit Analysis of the site remediation of a former gas plant
    Huysegoms, Lies
    Rousseau, Sandra
    Cappuyns, Valerie
    [J]. SCIENCE OF THE TOTAL ENVIRONMENT, 2018, 619 : 258 - 271
  • [6] Evaluation of alternatives in the remediation of a former explosive manufacturing site
    García-Delgado, RA
    Grima, J
    Barettino, D
    [J]. WASTE MANAGEMENT AND THE ENVIRONMENT II, 2004, : 663 - 671
  • [7] Radioecological assessment and remediation planning at the former uranium milling facilities at the Pridnieprovsky Chemical Plant in Ukraine
    Lavrova, Tetyana
    Voitsekhovych, Oleg
    [J]. JOURNAL OF ENVIRONMENTAL RADIOACTIVITY, 2013, 115 : 118 - 123
  • [8] Assessment of Occupational Health and Safety for a Gas Meter Manufacturing Plant
    Korkmaz, Ece
    Iskender, Gulen
    Babuna, Fatos Germirli
    [J]. WORLD MULTIDISCIPLINARY EARTH SCIENCES SYMPOSIUM (WMESS 2016), PTS 1-4, 2016, 44
  • [9] Remediation and development of a former military manufacturing and test site in Florida USA
    Olsen, R. L.
    Woods, A. B.
    Edgar, M. H.
    [J]. BROWNFIELD SITES III: PREVENTION, ASSESSMENT, REHABILITATION AND DEVELOPMENT OF BROWNFIELD SITES, 2006, 94 : 121 - +
  • [10] An integrated approach to in-situ remediation of a former paint manufacturing facility
    Ballesteros, F. C.
    DeSales, L. F.
    Pamintuan, G. D.
    [J]. WASTE MANAGEMENT AND THE ENVIRONMENT V, 2010, 140 : 349 - 355