共 50 条
- [1] Planning and constructing work schedules that account for unit and product assembly [J]. Automation and Remote Control, 2014, 75 : 373 - 381
- [2] EFFECTS OF PRODUCT STRUCTURE ON PLANNING OF WORK ON AN EQUIPMENT ASSEMBLY LINE [J]. WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1978, 68 (03): : 133 - 136
- [3] Formation of Work Plans and Schedules at Enterprises with Conveyor Assembly [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, APMS 2021, PT I, 2021, 630 : 572 - 579
- [5] An Algorithm Analyzing Sequence of Multiple Assembly Schedules for Mechanical Product [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7531 - 7534
- [6] Constraint ratio in product assembly planning [J]. The International Journal of Advanced Manufacturing Technology, 1997, 13 : 401 - 406
- [7] Constraint ratio in product assembly planning [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1997, 13 (06): : 401 - 406
- [8] AFTER ACHESON ... CONSTRUCTING A PRIMARY CARE UNIT - THE WORK [J]. BRITISH MEDICAL JOURNAL, 1983, 286 (6366): : 687 - 688
- [9] Assembly Sequence Planning for Constructing Planar Structures with Rectangular Modules [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), 2016, : 5477 - 5482
- [10] Research on Product Assembly Path Planning Under the Digital Assembly Environment [J]. PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS, VOLS 1 AND 2, 2009, : 1966 - 1971