INTEGRATION OF RISK INSIGHTS INTO NUCLEAR POWER PLANT OPERATIONS

被引:0
|
作者
Schinzel, Glen E.
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Today's nuclear plant operator is challenged to safely operate a complex power plant while prudently managing the business aspects with efficiency. Risk insights provide a ready tool to aid today's operators in effectively performing both of these sometimes contradictory tasks with a sound basis. While plants possess and maintain Probabilistic Risk Assessment (PRA) models, other regulatory applications are readily available to aid the nuclear operator. Some of these tools include 10CFR 50.69 Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors, Industry Initiative 4(b) Risk Momaged Technical Specifications, and Industry Initiative 5(b) Risk-informed Surveillance Test Intervals. This paper will introduce each of these risk-informed tools and will discuss practical applications of these insights at the South Texas Project nuclear power plant. These insights are readily translatable to other nuclear power facilities. 10CFR 50.69 permits a risk-informed categorization of selected structures, systems, and components. For components determined to be Low Safety Significant, many of the current regulatory controls can be reduced while maintaining reasonable confidence that these 'Low-ranked' components continue to perform their design functional requirements. South Texas Project was the industry's proto-type pilot for this effort. Initiative 4(b) is a risk-informed, configuration-based approach to managing Technical Specification allowed Out of service times. The limiting, deterministic allowed outage times are replaced with a Configuration Risk Management Program which uses risk threshold values to determine the length of time a Technical Specification piece of equipment can remain out of service. An imposed back-stop of 30 days is used to limit the allowed outage time. This approach was approved for South Texas Project in July 2007, and South Texas Project was the industry pilot plant for this effort. Initiative 5(b) is a risk-informed approach to Technical Specification surveillance test intervals. This approach allows surveillance test intervals to be removed from Tech Specs and placed in an owner-controlled program. Once relocated, a blending of probabilistic and deterministic insights is used to assess proposed extensions of surveillance test intervals. Once implemented, a feedback process is relied upon to validate the acceptability of the revised testing interval. This approach was piloted by the Limerick Nuclear Station, and South Texas Project submitted a request in October 2007 to the NRC to pursue this initiative. The above risk insights have proven very effective at South Texas Project, and could aid other nuclear operators in making well-founded, informed decisions. Risk insights also allow a Station's limited resources to be focused on those activities and equipment which are of greatest safety significance. These insights are valuable for current licensees, and may be very beneficial to apply toward new nuclear construction.
引用
收藏
页码:947 / 956
页数:10
相关论文
共 50 条
  • [1] Insights into the Societal Risk of Nuclear Power Plant Accidents
    Denning, Richard
    Mubayi, Vinod
    [J]. RISK ANALYSIS, 2017, 37 (01) : 160 - 172
  • [2] Hypermedia integration of information resources for nuclear plant operations
    Tsoukalas, LH
    Uhrig, RE
    [J]. NUCLEAR TECHNOLOGY, 1997, 119 (01) : 48 - 62
  • [3] Risk Perceptions of Resuming Nuclear Power Plant Operations After Fukushima: A Student Survey
    Seo, Kami
    Motoyoshi, Tadahiro
    Maeda, Yasunobu
    [J]. JOURNAL OF DISASTER RESEARCH, 2016, 11 (789-797) : 789 - 797
  • [4] Risk monitor for nuclear power plant
    Xu, Yaowu
    Xue, Dazhi
    Xi, Shuren
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 1997, 18 (04): : 298 - 302
  • [5] Data transfer from the integration operations management system of the Emsland Nuclear Power Plant to the ZEBD systems of the VGB
    Kahlert, W
    Jurgensen, H
    Lutzow, K
    [J]. ANNUAL MEETING ON NUCLEAR TECHNOLOGY '96, 1996, : 521 - 524
  • [6] Towards an estimation aid for nuclear power plant refuelling operations
    Steele, JA
    Martin, LA
    Moyes, A
    McArthur, SDJ
    McDonald, JR
    Young, D
    Elrick, R
    Howie, D
    Yule, IY
    [J]. INTELLIGENT PROBLEM SOLVING: METHODOLOGIES AND APPROACHES, PROCEEDINGS, 2000, 1821 : 56 - 66
  • [7] A computational situation assessment model for nuclear power plant operations
    Miao, AX
    Zacharias, GL
    Kao, SP
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 1997, 27 (06): : 728 - 742
  • [8] An Unsafe Act Autodetection Methodology in Nuclear Power Plant Operations
    Ahn, Jeeyea
    Kim, Jae Min
    Lee, Seung Jun
    [J]. HCI INTERNATIONAL 2018 - POSTERS' EXTENDED ABSTRACTS, PT I, 2018, 850 : 333 - 339
  • [9] INDEPENDENT REVIEW AND AUDIT OF NUCLEAR-POWER PLANT OPERATIONS
    ROWLES, WC
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1977, 26 : 32 - 33
  • [10] Cesium isotope ratios as indicators of nuclear power plant operations
    Delmore, James E.
    Snyder, Darin C.
    Tranter, Troy
    Mann, Nick R.
    [J]. JOURNAL OF ENVIRONMENTAL RADIOACTIVITY, 2011, 102 (11) : 1008 - 1011