Kinematics performance simulation and optimization of large face-shovel hydraulic excavator working device based on ADAMS

被引:2
|
作者
She, Yini [1 ]
Ning, Xiaobin [1 ]
Lin, Qiong [1 ]
机构
[1] Zhejiang Univ Technol, Coll Mech Engn, Hangzhou, Zhejiang, Peoples R China
关键词
Face-shovel hydraulic excavator; working device; kinematics; Monte Carlo method;
D O I
10.4028/www.scientific.net/AMM.271-272.996
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In order to study the influence of key hinge point's positions to the kinematical performance of the face-shovel hydraulic excavator working device, a forward kinematics model of the working device is presented firstly. And then the simulation model is established in ADAMS. The working processes are simulated and the bucket digging envelope diagram is drawn. Then different simulation models in ADAMS are established by using Monte Carlo method to sample data which are the range of key hinge point's position. According to a certain order and requirement of objective response, the model with better motive performance can be chosen. The results show that the chosen model has better kinematical performance than that of the initial model where all of important objective responses can be improved differently.
引用
收藏
页码:996 / 1000
页数:5
相关论文
共 50 条
  • [1] Research on a New Working Mechanism of Face-shovel Hydraulic Excavator
    Cai G.
    Huang Y.
    Tian J.
    Gong J.
    Wei W.
    Xing S.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2021, 57 (13): : 132 - 143
  • [2] Kinematics and dynamics analyses of a new type face-shovel hydraulic excavator
    Ding, Huafeng
    Han, Lei
    Yang, Wenjian
    Wu, Chuan
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2017, 231 (05) : 909 - 924
  • [3] Multi-objective optimization and simulation of novel working mechanism for face-shovel excavator
    Yunhua Li
    Xiangyang Mu
    Rujun Fan
    International Journal of Intelligent Robotics and Applications, 2021, 5 : 1 - 9
  • [4] Multi-objective optimization and simulation of novel working mechanism for face-shovel excavator
    Li, Yunhua
    Mu, Xiangyang
    Fan, Rujun
    INTERNATIONAL JOURNAL OF INTELLIGENT ROBOTICS AND APPLICATIONS, 2021, 5 (01) : 1 - 9
  • [5] Arm lifting circuit and features of large face-shovel hydraulic excavator
    Key Laboratory of Advanced Transducers and Intelligent Control System of Ministry of Education, Taiyuan University of Technology, Taiyuan
    030024, China
    Jixie Gongcheng Xuebao, 20 (180-187):
  • [6] Many-objective Optimization Design for TriRocker Working Mechanism of Face-shovel Hydraulic Excavator
    Xu G.
    Feng Z.
    Guo E.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2023, 59 (03): : 54 - 65
  • [7] Design in face-shovel hydraulic excavator based on question-answer drive
    Ning, Xiaobin
    She, Yini
    Li, Aifeng
    Journal of Applied Sciences, 2013, 13 (12) : 2196 - 2202
  • [8] Optimization of face-shovel excavator's attachment based on improved NSGA-II
    Key Laboratory of Advanced Forging & Stamping Technology and Science, Yanshan University, Ministry of Education of China, Qinhuangdao
    066004, China
    不详
    066004, China
    Jixie Gongcheng Xuebao, 21 (35-43):
  • [9] Experimental research on digging resistance for large hydraulic face-shovel
    Chen, Jin
    Li, Weibo
    Zhang, Shiqiang
    Zhong, Chunjian
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2008, 19 (05): : 518 - 521
  • [10] Simulation and optimization of hydraulic excavator's working device based on MATLAB
    Cai, Y.-X., 1600, Journal of Chemical and Pharmaceutical Research, 3/668 Malviya Nagar, Jaipur, Rajasthan, India (06):