摘要
Deregulation in the electricity market offers freedom to the generator companies (GENCOs) to schedule their generators in order to maximize their profit without actually satisfying the load and the reserve requirements. Various techniques have been developed for solving the profit based unit commitment (PBUC) problem. Among them, the multi-agent approach is different where each generator unit is referred to as an intelligent agent. In this paper, we develop a new multi-agent approach for PBUC problem in which the rule based intelligence is provided to the independent system operator (ISO) agent. Intelligence of generator agents (GenAgents) is limited to maximize their profit for the given demand and reserve using real-parametric genetic algorithm (GA) and share the results with ISO agent. In this approach, ISO agent commits the maximum profit generating GenAgents for every hour while satisfying the up/down time constraints. ISO agent also asks other GenAgents to calculate their profit for the remaining demand and reserve. The simulation results of 10 units problem for two payment methods are shown and compared with other techniques.
引用
收藏
页码:2527 / 2533
页数:7
相关论文
共 50 条
  • [1] Multi-agent modeling for solving profit based unit commitment problem
    Sharma, Deepak
    Trivedi, Anupam
    Srinivasan, Dipti
    Thillainathan, Logenthiran
    [J]. APPLIED SOFT COMPUTING, 2013, 13 (08) : 3751 - 3761
  • [2] A multi-agent approach to unit commitment
    Nagata, T
    Ohno, M
    Sasaki, H
    Fujita, H
    [J]. ELECTRICAL ENGINEERING IN JAPAN, 2002, 141 (02) : 41 - 47
  • [3] A multi-agent approach to unit commitment problems
    Nagata, T
    Ohono, M
    Kubokawa, J
    Sasaki, H
    Fujita, H
    [J]. 2002 IEEE POWER ENGINEERING SOCIETY WINTER MEETING, VOLS 1 AND 2, CONFERENCE PROCEEDINGS, 2002, : 64 - 69
  • [4] New approach with Muller method for Profit Based Unit Commitment
    Chandram, K.
    Subrahmanyam, N.
    Sydulu, M.
    [J]. 2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 5392 - +
  • [5] Rights and commitment in multi-agent agreements
    Norman, TJ
    Sierra, C
    Jennings, NR
    [J]. INTERNATIONAL CONFERENCE ON MULTI-AGENT SYSTEMS, PROCEEDINGS, 1998, : 222 - 229
  • [6] Limited commitment in multi-agent contracting
    Feltham, Gerald A.
    Hofmann, Christian
    [J]. CONTEMPORARY ACCOUNTING RESEARCH, 2007, 24 (02) : 345 - +
  • [7] MOPSO approach to solve Profit Based Unit Commitment problem (PBUCP)
    Dhifaoui, Chefai
    Guesmi, Tawfik
    Hadj Abdallah, Hsan
    [J]. 2015 4TH INTERNATIONAL CONFERENCE ON SYSTEMS AND CONTROL (ICSC), 2015, : 175 - 182
  • [8] New approach with Muller method for solving Profit Based Unit Commitment
    Chandram, K.
    Subrahmanyam, N.
    Sydulu, M.
    [J]. 2008 THIRD INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1-6, 2008, : 952 - 957
  • [9] Profit-based unit commitment with emission limitations: A multiobjective approach
    Catalao, J. P. S.
    Mariano, S. J. P. S.
    Mendes, V. M. F.
    Ferreira, L. A. F. M.
    [J]. 2007 IEEE LAUSANNE POWERTECH, VOLS 1-5, 2007, : 1417 - +
  • [10] A sequential evolutionary programming approach to profit-based unit commitment
    Contreras-Hernandez, E. J.
    Cedeno-Maldonado, J. R.
    [J]. 2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION: LATIN AMERICA, VOLS 1-3, 2006, : 1112 - +