共 50 条
- [3] The Capacitated Production Planning Problem with Sequence-Dependent Changeovers [J]. IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2363 - +
- [5] Production planning and scheduling with material handling using modelling and simulation [J]. 21ST INNOVATIVE MANUFACTURING ENGINEERING & ENERGY INTERNATIONAL CONFERENCE - IMANE&E 2017, 2017, 112
- [7] A MIP FOR THE INTEGRATED PRODUCTION AND TRANSPORTATION SCHEDULING OF AN OEM [J]. PROCEEDINGS ICIL'2010: INTERNATIONAL CONFERENCE ON INDUSTRIAL LOGISTICS - LOGISTICS AND SUSTAINABILITY, 2010, : 163 - 171
- [10] The Advanced Production Planning of Automated Scheduling Problems in Irradiation Industry [J]. MANUFACTURING ENGINEERING AND AUTOMATION I, PTS 1-3, 2011, 139-141 : 1688 - +