Assessment of metal removal, biomass activity and RO concentrate treatment in an MBR-RO system

被引:55
|
作者
Malamis, Simos [1 ]
Katsou, Evina [1 ]
Takopoulos, Konstantinos [1 ]
Demetriou, Prokopis [1 ]
Loizidou, Maria [1 ]
机构
[1] Natl Tech Univ Athens, Unit Environm Sci & Technol, Sch Chem Engn, GR-15773 Athens, Greece
关键词
Membrane bioreactor (MBR); Reverse osmosis (RO); Heavy metals; Concentrate; Fixed bed column; MUNICIPAL WASTE-WATER; MEMBRANE BIOREACTOR PROCESSES; REVERSE-OSMOSIS; ACTIVATED-SLUDGE; TREATMENT PLANTS; REUSE; WASTEWATERS; RECLAMATION; FATE;
D O I
10.1016/j.jhazmat.2011.10.085
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This work investigated the removal of metals from wastewater using a combined Membrane Bioreactor-Reverse Osmosis (MBR-RO) system. The concentrate produced by the RO system was treated by a fixed bed column packed with zeolite. The average metal removal accomplished by the MBR treating municipal wastewater was Cu(90%), Fe(85%), Mn(82%), Cr(80%), Zn(75%), Pb(73%), Ni(67%), Mg(61%), Ca(57%), Na(30%) and K(21%), with trivalent and divalent metals being more effectively removed than monovalent ones. The metal removal achieved by the MBR system treating wastewater spiked with Cu, Pb, Ni and Zn (4-12 mg L-1 of each metal) was Pb(96%)>Cu(85%)>Zn(78%)>Ni(48%). The combined MBR-RO system enhanced metal removal from municipal wastewater to the levels of >90.9->99.8%, while for wastewater spiked with heavy metals the removal efficiencies were >98.4%. Fixed bed column packed with zeolite was effective for the removal of Cu, Pb and Zn from the RO concentrate, while Ni removal was satisfactory only at the initial stages of column operation. The presence of heavy metals increased inorganic fouling. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:1 / 8
页数:8
相关论文
共 50 条
  • [1] Priority pollutants and other micropollutants removal in an MBR-RO wastewater treatment system
    Plevri, A.
    Noutsopoulos, C.
    Mamais, D.
    Makropoulos, C.
    Andreadakis, A.
    Lytras, E.
    Samios, S.
    [J]. DESALINATION AND WATER TREATMENT, 2018, 127 : 121 - 131
  • [2] Advanced treatment of semiconductor wastewater by combined MBR-RO technology
    Xiao, Yan
    Chen, Tong
    Hu, Yongjian
    Wang, Deshan
    Han, Yongping
    Lin, Yakai
    Wang, Xiaolin
    [J]. DESALINATION, 2014, 336 : 168 - 178
  • [3] Removal of emerging contaminants from municipal wastewater with an integrated membrane system, MBR-RO
    Dolar, Davor
    Gros, Meritxell
    Rodriguez-Mozaz, Sara
    Moreno, Jordi
    Comas, Joaquim
    Rodriguez-Roda, Ignasi
    Barcelo, Damia
    [J]. JOURNAL OF HAZARDOUS MATERIALS, 2012, 239 : 64 - 69
  • [4] Advanced Treatment of Coking Wastewater by Sequencing Batch MBR-RO
    Wang, Jiao
    [J]. CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 2791 - 2796
  • [5] Impact of fouling index behavior in RO fed at different MBR operating conditions in MBR-RO
    Park, Ki Tae
    Park, Jun Young
    Kim, Minjin
    Kim, Hyung Soo
    Kim, Ji Hoon
    [J]. DESALINATION AND WATER TREATMENT, 2018, 106 : 32 - 39
  • [6] Concentrate management for integrated MBR-RO process for wastewater reclamation and reuse-preliminary tests
    Tomasini, Horacio R.
    Hacifazlioglu, Mert C.
    Kabay, Nalan
    Bertin, Lorenzo
    Pek, Taylan O.
    Yuksel, Mithat
    [J]. JOURNAL OF WATER PROCESS ENGINEERING, 2019, 29
  • [7] Promoting on-site urban wastewater reuse through MBR-RO treatment
    Plevri, A.
    Mamais, D.
    Noutsopoulos, C.
    Makropoulos, C.
    Andreadakis, A.
    Rippis, K.
    Smeti, E.
    Lytras, E.
    Lioumis, C.
    [J]. DESALINATION AND WATER TREATMENT, 2017, 91 : 2 - 11
  • [8] MBR-RO组合工艺污水回收中试研究
    曹斌
    黄霞
    ATSUSHI Kitanaka
    杨瑜芳
    [J]. 环境科学, 2008, (04) : 915 - 919
  • [9] Fouling reduction in MBR-RO processes: the effect of MBR F/M ratio
    Kitade, Tamotsu
    Wu, Bing
    Chong, Tzyy Haur
    Fane, Anthony G.
    Uemura, Tadahiro
    [J]. DESALINATION AND WATER TREATMENT, 2013, 51 (25-27) : 4829 - 4838
  • [10] Experimental Study on Treatment of Leachate from Domestic Rubbish Burning Plant by Using MBR-RO System
    Yao Hong
    Lv Zeyu
    Zhang Qiong
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2008, : 210 - 216