Superiority of Unit Serial Method Used in CRTS III-Type Pretensioning Ballastless Track Slab Production

被引:0
|
作者
Wang, Baoqun [1 ]
Pei, Lei [2 ]
Ai, Qikai [2 ]
Zheng, Hongbin [3 ]
Si, Wei [1 ]
机构
[1] ShanDong JiaoTong Univ, Jinan, Peoples R China
[2] Shandong Hispeed Rail Transit Grp Co Ltd, Jinan, Peoples R China
[3] China Railway 23rd Grp Co Ltd, Beijing, Peoples R China
关键词
CRTS III-type pretensioning ballastless; Matrix method; Production process; Unit serial method;
D O I
10.1007/978-981-10-7989-4_92
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
High-speed railway ballastless track two-way pretensioning prestressed track slab by the unit serial method is a new type of track slab prestressed system developed in China. The research group developed the track slab production equipment and tooling and formed a 24 h production process. This is the first time in the world to achieve large-scale production of two-way pretensioning prestressed track slab through production lines. Also, this method has been tested and put into production in Shandong Linqu. Compared to the traditional matrix method of the track slab production process, this new method greatly improves the production efficiency and reduces the manufacturing cost of track slab. This can fulfill the high volume demand of track slab raised by "The Belt and Road Initiative" strategy.
引用
收藏
页码:915 / 920
页数:6
相关论文
共 43 条
  • [1] Key Innovative Technology of CRTS III Type Pre-Tensioning Ballastless Track Slab by Unit Serial Method
    Wang Baoqun
    Pei Lei
    Ai Qikai
    Zheng Hongbin
    Si Wei
    2017 2ND IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION ENGINEERING (ICITE), 2017, : 103 - 107
  • [2] Study on the basic mechanical characteristics of CRTS III slab ballastless track
    Zhu, Kunteng
    Liu, Bin
    Zeng, Zhiping
    He, Xianfeng
    Wu, Bin
    Zeng, Dapeng
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2015, 8 : 1475 - 1478
  • [3] The Exploration and Research of CRTS I Slab Ballastless Track Used in the Freight Lines
    Peng, Donghui
    Wei, Zisen
    Liu, Juefei
    SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 2031 - 2034
  • [4] Damage assessment of the CRTS III ballastless slab track in high temperature regions
    Walubita, Emmanuel
    Li, Haiyan
    Li, Yang
    Shi, Xianfeng
    STRUCTURES, 2024, 69
  • [5] Vehicle running safety on CRTS III slab ballastless track under earthquake
    Lou, Ping
    Gong, Kailun
    Zhao, Chen
    1600, Central South University Press (17): : 1 - 7
  • [6] Applicability of solar-reflective coatings on the CRTS III ballastless slab track
    Shi, Xianfeng
    Walubita, Emmanuel
    Li, Yang
    Li, Haiyan
    CONSTRUCTION AND BUILDING MATERIALS, 2025, 467
  • [7] Influence of interface crack on dynamic characteristics of CRTS III slab ballastless track on bridge
    Yan Bin
    Cheng Rui-qi
    Pan Wen-bin
    Xie Hao-ran
    Fu He-xin
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2022, 29 (08) : 2665 - 2674
  • [8] Research on Target Localization Method of CRTS-III Slab Ballastless Track Plate Based on Machine Vision
    Liu, Xinjun
    Wu, Wenjiang
    Zheng, Liaomo
    Wang, Shiyu
    Zhang, Qiang
    Wang, Qi
    ELECTRONICS, 2021, 10 (23)
  • [9] Research on Uniform Temperature of CRTS II Slab-type Ballastless Track on Bridge
    Dai, Gonglian
    Yang, Linghao
    Zhu, Junpu
    Su, Haiting
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2017, 44 (07): : 136 - 142
  • [10] An Analytical Solution for the Geometry of High-Speed Railway CRTS III Slab Ballastless Track
    Liu, Lili
    Jiang, Lizhong
    Zhou, Wangbao
    Liu, Xiang
    Feng, Yulin
    MATHEMATICS, 2022, 10 (18)