Resource Constrained Job Scheduling with Parallel Constraint-Based ACO

被引:8
|
作者
Cohen, Dror [1 ]
Gomez-Iglesias, Antonio [2 ]
Thiruvady, Dhananjay [3 ,4 ]
Ernst, Andreas T. [3 ]
机构
[1] Monash Univ, Fac Informat Technol, Clayton, Vic, Australia
[2] Univ Texas Austin, Texas Adv Comp Ctr, Austin, TX 78712 USA
[3] Monash Univ, Sch Math Sci, Clayton, Vic, Australia
[4] Bayesian Intelligence Pty Ltd, Clayton, Vic, Australia
关键词
ANT COLONY OPTIMIZATION; BEAM-ACO; SEARCH;
D O I
10.1007/978-3-319-51691-2_23
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Hybrid methods are highly effective means of solving combinatorial optimization problems and have become increasingly popular. In particular, integrations of exact and incomplete methods have proved to be effective where the hybrid takes advantage of the relative performance of each individual method. However, these methods often require significant run-times to determine good feasible solutions. One way of reducing run-times is to parallelize these algorithms. For large NP-hard problems, parallelization must be done with care, since changes to the algorithm can affect its performance in unpredictable ways. In this paper we develop two parallel variants of constraint-based ACO and test them on a problem arising in the Australian mining industry. We demonstrate that parallelization significantly reduces run times with each parallel variant providing advantages with respect to feasibility and solution quality.
引用
收藏
页码:266 / 278
页数:13
相关论文
共 50 条
  • [1] Constraint-based ACO for a shared resource constrained scheduling problem
    Thiruvady, Dhananjay
    Singh, Gaurav
    Ernst, Andreas T.
    Meyer, Bernd
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) : 230 - 242
  • [2] Constraint-Based Job and Resource scheduling in Grid Computing
    Soni, Vishnu Kant
    Sharma, Raksha
    Mishra, Manoj Kumar
    Das, Sarita
    [J]. ICCSIT 2010 - 3RD IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, VOL 4, 2010, : 334 - 337
  • [3] A CONSTRAINT-BASED PERSPECTIVE IN RESOURCE CONSTRAINED PROJECT SCHEDULING
    ULUSOY, G
    OZDAMAR, L
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (03) : 693 - 705
  • [4] Hybrids of Integer Programming and ACO for Resource Constrained Job Scheduling
    Thiruvady, Dhananjay
    Singh, Gaurav
    Ernst, Andreas T.
    [J]. HYBRID METAHEURISTICS, HM 2014, 2014, 8457 : 130 - 144
  • [5] A Constraint-Based Approach to Modeling and Solving Resource-Constrained Scheduling Problems
    Sitek, Pawel
    Wikarek, Jaroslaw
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 423 - 433
  • [6] Constraint-based algorithm for Job Shop scheduling
    Guo, Dong-Fen
    Li, Tie-Ke
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2007, 13 (01): : 117 - 125
  • [7] Surrogate-assisted population based ACO for resource constrained job scheduling with uncertainty
    Thiruvady, Dhananjay
    Su Nguyen
    Shiri, Fatemeh
    Zaidi, Nayyar
    Li, Xiaodong
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2022, 69
  • [8] Modelling resource transitions in constraint-based scheduling
    Barták, R
    [J]. SOFSEM 2002: THEORY AND PRACTICE OF INFORMATICS, 2002, 2540 : 186 - 194
  • [9] Constraint-based job shop scheduling with ILOG SCHEDULER
    ILOG S.A., Gentilly, France
    [J]. J Heuristics, 4 (271-286):
  • [10] Constraint-Based Job Shop Scheduling with ILOG SCHEDULER
    Nuijten W.
    Le Pape C.
    [J]. Journal of Heuristics, 1998, 3 (4) : 271 - 286