Recovery of Boron from the Clay Waste of Boron Industry by Leaching

被引:2
|
作者
Kipcak, Ilker [1 ]
Ozdemir, Mine [1 ]
机构
[1] Eskisehir Osmangazi Univ, Dept Chem Engn, TR-26480 Meselik, Eskisehir, Turkey
关键词
boron recovery; leaching kinetics; sulfuric acid; clay waste; boric acid; BORAX SLUDGE; WATER;
D O I
10.1515/1542-6580.2468
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In this study, the recovery of boron from the clay waste of boron industry by leaching with sulfuric acid solution was studied in a batch reactor and the subsequent production of boric acid (H3BO3) was investigated. The effects of acid concentration, solid-to-liquid ratio and reaction temperature on the leaching process were examined. Experimental studies were carried out in the ranges of 0.1-1.0 M for acid concentration, 1-10 g/120 mL for solid-to-liquid ratio and 25-75 degrees C for reaction temperature. The analysis of the experimental data showed that the kinetics of the leaching process fitted the Avrami model in the form of X = 1 -exp (-k t (n)). For the production of boric acid, the optimum leaching conditions were determined as follows: acid concentration, 0.1 M; solid-to-liquid ratio, 6 g/120 mL; reaction temperature, 50 degrees C and reaction time, 60 min. Finally, boric acid was produced in the purity of more than 95% by crystallization of the leach solution.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Boron recovery from montmorillonite clay waste using sequential leaching followed by cooling crystallization techniques
    Çelebi E.E.
    Öncel M.S.
    Arabian Journal of Geosciences, 2021, 14 (9)
  • [2] Recovery of boron from borax sludge of boron industry
    Ozdemir, Mine
    Kipcak, Ilker
    MINERALS ENGINEERING, 2010, 23 (09) : 685 - 690
  • [3] Overcoming clay structure challenges in lithium recovery from boron waste using high-temperature pressure acid leaching
    Younes, Noha Nagy
    Turan, Mehmet Deniz
    Erdem, Mehmet
    CANADIAN JOURNAL OF CHEMICAL ENGINEERING, 2024,
  • [4] Boron recovery from clay waste using Diaion CRB-02 resin
    Kipcak, I.
    Ozdemir, M.
    ENVIRONMENTAL TECHNOLOGY, 2010, 31 (03) : 327 - 335
  • [5] Boron recovery from borax sludge, boron industrial waste, by solid-liquid extraction
    Özdemir, M
    Kipçak, I
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (21) : 5256 - 5260
  • [6] BORON LEACHING
    MEYER, JL
    AYERS, RS
    CALIFORNIA AGRICULTURE, 1968, 22 (09) : 6 - &
  • [7] Utilisation of waste clay from boron production as a landfill liner material
    Banar, Mufide
    Gueney, Yucel
    Ozkan, Aysun
    Gunkaya, Zerrin
    Bayrakci, Eren
    Ulutas, Derya
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2019, 33 (03) : 206 - 222
  • [8] LEACHING OF BORON FROM COAL ASH
    COX, JA
    LUNDQUIST, GL
    PRZYJAZNY, A
    SCHMULBACH, CD
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 1978, 12 (06) : 722 - 723
  • [9] The use of boron waste clay to improve the geotechnical properties of a high plasticity clay
    Kurt Albayrak Z.N.
    Turan E.
    Arabian Journal of Geosciences, 2021, 14 (11)
  • [10] A new boron impregnation technique of wood by vapor boron of boric acid to reduce leaching boron from wood
    Ergun Baysal
    Mustafa Kemal Yalinkilic
    Wood Science and Technology, 2005, 39 : 187 - 198