Cache size selection for performance, energy and reliability of time-constrained systems*

被引:0
|
作者
Cai, Yuan [1 ]
Schmitz, Marcus T. [2 ]
Ejlaii, Alireza [2 ]
Al-Hashirui, Bashir M. [2 ]
Reddy, Sudhakar M. [1 ]
机构
[1] Univ Iowa, Dept Elect & Comp Engn, Iowa City, IA 52242 USA
[2] Univ Southampton, Southampton SO9 5NH, Hants, England
基金
英国工程与自然科学研究理事会;
关键词
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Improving performance, reducing energy consumption and enhancing reliability are three important objectives for embedded computing systems design. In this paper, we study the joint impact of cache size selection on these three objectives. For this purpose, we conduct extensive fault injection experiments on five benchmark examples using a cycle-accurate processor simulator. Performance and reliability are analyzed using the performability metric. Overall, our experiments demonstrate the importance of a careful cache size selection when designing energy-efficient and reliable systems. Furthermore, the experimental results show the existence of optimal or Pareto-optimal cache size selection to optimize the three design objectives.
引用
收藏
页码:923 / 928
页数:6
相关论文
共 50 条
  • [1] Time-constrained keyframe selection technique
    Girgensohn, Andreas
    Boreczky, John
    International Conference on Multimedia Computing and Systems -Proceedings, 1999, 1 : 756 - 761
  • [2] Time-constrained keyframe selection technique
    Girgensohn, A
    Boreczky, J
    MULTIMEDIA TOOLS AND APPLICATIONS, 2000, 11 (03) : 347 - 358
  • [3] Time-Constrained Keyframe Selection Technique
    Andreas Girgensohn
    John Boreczky
    Multimedia Tools and Applications, 2000, 11 : 347 - 358
  • [4] Overhead-conscious voltage selection for dynamic and leakage energy reduction of time-constrained systems
    Andrei, A
    Schmitz, M
    Eles, P
    Peng, Z
    Al-Hashimi, BM
    IEE PROCEEDINGS-COMPUTERS AND DIGITAL TECHNIQUES, 2005, 152 (01): : 28 - 38
  • [5] Time-constrained keyframe selection technique
    Girgensohn, A
    Boreczky, J
    IEEE INTERNATIONAL CONFERENCE ON MULTIMEDIA COMPUTING AND SYSTEMS, PROCEEDINGS VOL 1, 1999, : 756 - 761
  • [6] Overhead-conscious voltage selection for dynamic and leakage energy reduction of time-constrained systems
    Andrei, A
    Schmitz, M
    Eles, P
    Peng, Z
    Al-Hashimi, BM
    DESIGN, AUTOMATION AND TEST IN EUROPE CONFERENCE AND EXHIBITION, VOLS 1 AND 2, PROCEEDINGS, 2004, : 518 - 523
  • [7] Time-constrained distributed program reliability analysis
    Natl Chiao Tung Univ, Hsinchu, Taiwan
    J Inf Sci Eng, 4 (891-911):
  • [8] Time-constrained distributed program reliability analysis
    Chen, DJ
    Chang, MS
    Sheng, MC
    Horng, MS
    JOURNAL OF INFORMATION SCIENCE AND ENGINEERING, 1998, 14 (04) : 891 - 911
  • [9] Accounting for Reliability in Unacknowledged Time-Constrained WSNs
    Parsch, Philip
    Masrur, Alejandro
    ACM TRANSACTIONS ON CYBER-PHYSICAL SYSTEMS, 2019, 3 (03)
  • [10] Time-Constrained Test Selection for Regression Testing
    Yu, Lian
    Xu, Lei
    Tsai, Wei-Tek
    ADVANCED DATA MINING AND APPLICATIONS (ADMA 2010), PT II, 2010, 6441 : 221 - 232