Maximizing the Long-run Average Expected Profit of a Periodic-Review Assemble-to-Order System

被引:0
|
作者
Zhao, Yaping [1 ]
Xu, Xiaoyun [1 ]
Li, Haidong [1 ]
机构
[1] Peking Univ, Dept Ind Engn & Management, Beijing 100084, Peoples R China
基金
美国国家科学基金会;
关键词
INVENTORY CONTROL; POLICIES; DEMAND; REPLENISHMENT;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This study considers an assemble-to-order system with periodic-reviews and a general bill of materials. The objective is to maximize the long-run average expected profit through policies including product price and component replenishment and allocation. An upper bound on the objective for all feasible policies is established through a two-stage stochastic programme (SP) which inspires the construction of a myopic policy. Particularly, the first-stage SP solution specifies the price and replenishment decisions, while the allocation decision resembles the second-stage SP recourse solution. A lower bound on the optimal policy is also provided. Numerical experiment results demonstrate that both the upper bound and the proposed policy are effective. This study brings new perspectives to supply chain management of assemble-to-order systems and suggests ways to improve profitability.
引用
收藏
页码:674 / 679
页数:6
相关论文
共 18 条
  • [1] Optimal FCFS Allocation Rules for Periodic-Review Assemble-To-Order Systems
    Huang, Kai
    de Kok, Ton
    [J]. NAVAL RESEARCH LOGISTICS, 2015, 62 (02) : 158 - 169
  • [2] On component commonality for periodic review assemble-to-order systems
    Deza, Antoine
    Huang, Kai
    Liang, Hongfeng
    Wang, Xiao Jiao
    [J]. ANNALS OF OPERATIONS RESEARCH, 2018, 265 (01) : 29 - 46
  • [3] On component commonality for periodic review assemble-to-order systems
    Antoine Deza
    Kai Huang
    Hongfeng Liang
    Xiao Jiao Wang
    [J]. Annals of Operations Research, 2018, 265 : 29 - 46
  • [4] On inventory allocation for periodic review assemble-to-order systems
    Deza, Antoine
    Huang, Kai
    Liang, Hongfeng
    Wang, Xiao Jiao
    [J]. DISCRETE APPLIED MATHEMATICS, 2020, 275 : 29 - 41
  • [5] Coordination with profit-sharing contracts in an assemble-to-order system
    Shao Xiao-feng
    Ji Jian-hua
    [J]. PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 476 - 480
  • [6] The use of rush deliveries in periodic review assemble-to-order systems
    Benbitour, Mohammed Hichame
    Sahin, Evren
    Dallery, Yves
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (13) : 4078 - 4097
  • [7] Analysis of an assemble-to-order system with different review periods
    Karaarslan, A. G.
    Kiesmueller, G. P.
    de Kok, A. G.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (02) : 335 - 341
  • [8] Estimation of average backorders for an assemble-to-order system with random batch demands through extreme statistics
    Lu, Yingdong
    [J]. NAVAL RESEARCH LOGISTICS, 2007, 54 (01) : 33 - 45
  • [9] Optimal control strategy for maximizing long-run average profits of a stochastic inventory manangement model
    Yang, Ruicheng
    Song, Guangai
    Yang, Xingmin
    [J]. ICIM 2006: Proceedings of the Eighth International Conference on Industrial Management, 2006, : 124 - 128
  • [10] Optimal production planning in a stochastic manufacturing system with long-run average cost
    Sethi, SP
    Suo, W
    Taksar, MI
    Zhang, Q
    [J]. JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1997, 92 (01) : 161 - 188