Fuzzy Bi-Objective Model for a Supply Chain Network Design Problem Considering Stochastic Transportation Leadtime

被引:2
|
作者
Sadeghi, Azadeh [1 ]
Sinaki, Roohollah Younes [1 ]
Suer, Gursel [1 ]
Celikbilek, Can [2 ]
机构
[1] Ohio Univ, Dept Ind & Syst Engn, Russ Coll Engn, Athens, OH 45701 USA
[2] DoubleDown Interact, Greater Seatle Area, WA USA
关键词
Fuzzy Stochastic Mixed-integer Non-linear Programming; Supply Chain Network Design; Decision Making; Transportation Leadtime; OPTIMIZATION;
D O I
10.1016/j.promfg.2020.01.296
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, a fuzzy bi-objective integer programming for a supply chain network design (SCND) problem considering stochastic transportation leadtime is proposed. The conflicting objectives considered in this study are maximizing the total net profit related to the supply chain network design and minimizing the probability of tardiness associated with transportation leadtime between manufacturing plant and distribution centers, and distribution centers and customers. It is assumed that possible risk associated with transportation leadtime follows a normal distribution with the established mean and standard deviation. The model was tested by varying risk levels in order to achieve the maximum satisfaction level in the network. By considering the acceptable satisfaction levels, analyzing the results of the proposed model will be providing different scenarios, which helps decision makers to have better insight to design the desired supply chain network. Results indicate that by decreasing the risk level, probability of earliness to deliver products to customers increases while profit decreases. (C) 2019 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:1517 / 1524
页数:8
相关论文
共 50 条
  • [1] A supply chain design problem with facility location and bi-objective transportation choices
    Olivares-Benitez, Elias
    Luis Gonzalez-Velarde, Jose
    Rios-Mercado, Roger Z.
    [J]. TOP, 2012, 20 (03) : 729 - 753
  • [2] A supply chain design problem with facility location and bi-objective transportation choices
    Elias Olivares-Benitez
    José Luis González-Velarde
    Roger Z. Ríos-Mercado
    [J]. TOP, 2012, 20 : 729 - 753
  • [3] A bi-objective supply chain design problem with uncertainty
    Cardona-Valdes, Y.
    Alvarez, A.
    Ozdemir, D.
    [J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2011, 19 (05) : 821 - 832
  • [4] A Bi-Objective Model on Multiperiod Green Supply Chain Network Design
    Zhen, Lu
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2020, 50 (03): : 771 - 784
  • [5] Fuzzy Bi-Objective Closed-Loop Supply Chain Network Design Problem with Multiple Recovery Options
    Zhou, Jian
    Xia, Wenying
    Wang, Ke
    Li, Hui
    Zhang, Qianyu
    [J]. SUSTAINABILITY, 2020, 12 (17)
  • [6] Designing a bi-objective stochastic blood supply chain network in a disaster
    Naghipour, Mohsen
    Bashiri, Mahdi
    [J]. PROCEEDINGS OF 2019 15TH IRAN INTERNATIONAL INDUSTRIAL ENGINEERING CONFERENCE (IIIEC), 2019, : 171 - 177
  • [7] Bi-objective closed-loop supply chain network design with risks in a fuzzy environment
    Dai, Zhuo
    Dai, Hong-mei
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (03) : 169 - 180
  • [8] A bi-objective integrated transportation and inventory management under a supply chain network considering multiple distribution networks
    Gupta, Srikant
    Vijaygargy, Lokesh
    Sarkar, Biswajit
    [J]. RAIRO-OPERATIONS RESEARCH, 2022, 56 (06) : 3991 - 4022
  • [9] Metaheuristic procedure for a bi-objective supply chain design problem with uncertainty
    Cardona-Valdes, Y.
    Alvarez, A.
    Pacheco, J.
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2014, 60 : 66 - 84
  • [10] A new bi-objective model for a closed-loop supply chain problem with inventory and transportation times
    Forouzanfar, F.
    Tavakkoli-Moghaddam, R.
    Bashiri, M.
    Baboli, A.
    [J]. SCIENTIA IRANICA, 2016, 23 (03) : 1441 - 1458