EVALUATION OF STEEL BRIDGE DECK MA MIXTURE PROPERTIES DURING CONSTRUCTION

被引:11
|
作者
Zou Guilian [1 ]
Zhang Xiaoning [1 ]
Chung Wu [2 ]
机构
[1] S China Univ Technol, Sch Civil Engn & Transportat, Guangzhou, Guangdong, Peoples R China
[2] Virginia Dept Transportat, Richmond, VA USA
来源
关键词
Guss Asphalt; Mastic Asphalt; steel bridge deck pavement; performance; construction process; Impact Toughness;
D O I
10.6119/JMST-014-0327-2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Responses of steel bridge deck pavement to environmental and traffic loadings are much different from those of normal highway asphalt concrete pavement or concrete bridge deck. Steel bridge deck pavement generally deals with more challenging conditions, especially orthotropic steel bridges (Seim and Ingham, 2004; Medani et al., 2007; Battista et al., 2008; Cong et al., 2009; Kashefi et al., 2010). Therefore, materials used in constructing the steel deck bridges must possess excellent properties. Guss Asphalt (GA) and Mastic Asphalt (MA) are two types of asphalt concrete primarily used in steel deck bridge pavement construction (Eulitz et al., 2004; Ripke, 2009; McFadyen and Blumensen, 2010; Bocci and Canestrari, 2012). These two materials are composed of specifically graded aggregate and high content of asphalt binder to form a coherent, voidless and impermeable solid or semi-solid mass at ambient temperatures, but sufficient fluid at construction temperatures. The asphalt concrete mixtures are placed using hand float or other suitable equipments. No compaction is required. Therefore, these types of asphalt concrete mixtures are termed as poured asphalt mixture. Two different types of poured asphalt mixtures are known: GA and MA. GA was developed in Germany and MA was originated in England. To obtain adequate workability, GA and MA have been mixed and constructed at temperatures between 200 degrees C and 240 degrees C. In this study, GA and MA mixture samples were prepared using both laboratory mixers and batch plant and truck mixers. Samples were subjected to laboratory testing to evaluate the workability, rutting resistance and fatigue cracking resistance of the poured type asphalt mixture. Test results indicated that mixing time had significant influence on workability, rutting resistance and fatigue cracking resistance of the poured type asphalt mixtures. Longer mixing time and higher mixing temperature resulted in better rutting resistance but lower fatigue cracking resistance(Pauli and Huang, 2013). Therefore, during construction, mixing time and higher mixing temperature need to be controlled to achieve adequate performance for both rutting and fatigue cracking. It is recommended that, during construction, the Dynamic Stability at 60 degrees C and Impact Toughness at 15 degrees C be used as the quality control indexes.
引用
收藏
页码:293 / 301
页数:9
相关论文
共 50 条
  • [1] Evaluation and prediction for effect of conductive gussasphalt mixture on corrosion of steel bridge deck
    Chen, Qian
    Wang, Chaohui
    Sun, Xiaolong
    Cao, Yangsen
    Guo, Tengteng
    Chen, Jiao
    CONSTRUCTION AND BUILDING MATERIALS, 2019, 228
  • [2] Evaluation of a Steel Girder Bridge Collapse during Deck Removal
    Jauregui, David V.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2014, 28 (04)
  • [3] Investigation of bridge deck deformation during construction
    Frantova, Michaela
    9TH INTERNATIONAL CONFERENCE: MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, VOLS 1-3, 2008, : 541 - 545
  • [4] Mechanical properties of steel fiber reinforced concrete material in construction of road bridge deck
    Luo, Xiaohu
    BRIDGE STRUCTURES, 2020, 16 (04) : 169 - 176
  • [5] Interlaminar thermal effect analysis of steel bridge deck pavement during gussasphalt mixture paving
    Liu, Yang
    Qian, Zhendong
    Zheng, Dong
    Zhang, Meng
    INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2019, 20 (11) : 1323 - 1335
  • [6] Evaluation on root-deck fatigue of orthotropic steel bridge deck
    Ji Bohai
    Liu Rong
    Chen Ce
    Hirofumi, Maeno
    Chen Xiongfei
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2013, 90 : 174 - 183
  • [7] Design A Thermosetting Asphalt Mixture for Surfacing on Orthotropic Steel Deck Bridge
    Chen Chun
    Qian Zhendong
    Wang Yongquan
    ADVANCES IN MATERIALS AND MATERIALS PROCESSING, PTS 1-3, 2013, 652-654 : 1221 - +
  • [8] A Stability Study of the Longest Steel Truss Deck Cable-stayed Bridge during Construction
    Xiang-min Yu
    De-wei Chen
    Zhi-zhou Bai
    KSCE Journal of Civil Engineering, 2019, 23 : 1717 - 1724
  • [9] A Stability Study of the Longest Steel Truss Deck Cable-stayed Bridge during Construction
    Yu, Xiang-min
    Chen, De-wei
    Bai, Zhi-zhou
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (04) : 1717 - 1724
  • [10] Numerical Evaluation of Toe-Deck Fatigue in Orthotropic Steel Bridge Deck
    Liu, Rong
    Ji, Bohai
    Wang, Manman
    Chen, Ce
    Maeno, Hirofum
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2015, 29 (06)