Evaluation of crack control methods for end zone cracking in prestressed concrete bridge girders

被引:0
|
作者
Okumus, Pinar [1 ]
Oliva, Michael G. [2 ]
机构
[1] Worcester Polytech Inst, Dept Civil & Environm Engn, Worcester, MA 01609 USA
[2] Univ Wisconsin, Dept Civil & Environm Engn, Madison, WI 53706 USA
来源
PCI JOURNAL | 2013年
关键词
Control; cutting order; debonding; end cracks; lifting; reinforcement; REINFORCEMENT;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Deep prestressed concrete bulb-tee girders exhibit cracking near the ends during prestress release. These cracks discourage engineers from using deep sections or may result in the rejection of the girders. The durability of the members is of concern, particularly if chloride ions reach strands through cracks. The effectiveness of various crack control methods used by the industry has not been well quantified or compared. This paper describes an evaluation of the effectiveness of existing and proposed crack control methods. The girder ends were analyzed using nonlinear finite element analysis verified by test data. Among the most effective crack control methods were debonding the strands at the ends, locating the lift loops at a distance equal to the girder depth from each end, and detensioning the strands beginning with the innermost ones.
引用
收藏
页码:91 / 105
页数:15
相关论文
共 50 条
  • [1] Evaluation of crack control methods for end zone cracking in prestressed concrete bridge girders
    Okumus, Pinar
    Oliva, Michael G.
    [J]. PCI Journal, 2013, 58 (02): : 91 - 105
  • [2] Proposed evaluation and repair procedures for precast, prestressed concrete girders with end-zone cracking
    [J]. Martí-Vargas, J.R., 1600, Precast/Prestressed Concrete Institute, 175 W. Jackson Boulevard, Chicago, 60604-2601, United States (58):
  • [3] Proposed evaluation and repair procedures for precast, prestressed concrete girders with end-zone cracking
    Marti-Vargas, Jose R.
    [J]. PCI JOURNAL, 2013, : 144 - 146
  • [4] Proposed evaluation and repair procedures for precast, prestressed concrete girders with end-zone cracking
    Hasenkamp, Christie J.
    Badie, Sameh S.
    Hanna, Kromel E.
    Tadros, Maher K.
    [J]. PCI Journal, 2012, 57 (02): : 94 - 119
  • [5] Proposed evaluation and repair procedures for precast, prestressed concrete girders with end-zone cracking
    Hasenkamp, Christie J.
    Badie, Sameh S.
    Hanna, Kromel E.
    Tadros, Maher K.
    [J]. PCI JOURNAL, 2012, : 94 - 119
  • [6] Proposed evaluation and repair procedures for precast, prestressed concrete girders with end-zone cracking Response
    Hasenkamp, Christie J.
    Badie, Sameh S.
    Hanna, Kromel E.
    Tadros, Maher K.
    [J]. PCI JOURNAL, 2013, : 146 - 147
  • [7] EFFECT OF END BLOCKS ON ANCHORAGE ZONE STRESSES IN PRESTRESSED CONCRETE GIRDERS
    SARLES, D
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1984, 29 (06): : 100 - 114
  • [8] Synthesis of Repair Materials and Methods for Reinforced Concrete and Prestressed Bridge Girders
    Ghaffary, Azin
    Moustafa, Mohamed A.
    [J]. MATERIALS, 2020, 13 (18)
  • [9] Investigation of repair techniques for deteriorated end regions of prestressed concrete bridge girders
    Rich, William B.
    Williams, Christopher S.
    Frosch, Robert J.
    [J]. PCI JOURNAL, 2023, 68 (02): : 52 - 70
  • [10] Investigation of repair techniques for deteriorated end regions of prestressed concrete bridge girders
    Martin/Martin, Denver
    CO, United States
    不详
    不详
    [J]. PCI J, 2023, 2 (52-70):