Assessment of Dam Overtopping Reliability using SUFI Based Overtopping Threshold Curve

被引:24
|
作者
Sharafati, A. [1 ]
Azamathulla, H. M. [2 ]
机构
[1] Islamic Azad Univ, Civil Engn Dept, Sci & Res Branch, Tehran, Iran
[2] Fiji Natl Univ, Hydraul Engn, Suva, Fiji
关键词
Overtopping; Reliability; Monte Carlo; Uncertainty; SUFI; HEC-HMS MODEL; UNIT-HYDROGRAPH; RISK ANALYSIS; UNCERTAINTY; RAINFALL; FLOOD; DERIVATION; RESERVOIR; SPILLWAY;
D O I
10.1007/s11269-018-1934-4
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Estimation of earth-fill dam height and dimension of spillway are strongly depend on accurate evaluation of dam overtopping reliability. Ideally, whole random and effective variables on overtopping should be considered for dam overtopping reliability assessment. However, taking into account all affecting random variables as well as overtopping reliability assessment using algorithms such as Monte Carlo (MC) could be excessively time consuming and impossible in some cases. In this study, new approach has been introduced as conditional reliability method and it has been tried to reduce the simulations time significantly by using combination of rainfall threshold theory, SUFI (Sequential Uncertainty Fitting) and MC methods. According two defined indexes, the obtain results shown, the relative error of new approach in computation of Jamishan dam overtopping reliability is less than 0.23%. Also, time saving in new method against to regular MC method is more than 87%. So, the new introduced method has more efficiency with acceptable accuracy for assessment of dam overtopping reliability. In addition, among hydrological and hydraulic uncertainties, hydrological uncertainties have more effect on overtopping reliability.
引用
收藏
页码:2369 / 2383
页数:15
相关论文
共 50 条
  • [1] Assessment of Dam Overtopping Reliability using SUFI Based Overtopping Threshold Curve
    A. Sharafati
    H. M. Azamathulla
    Water Resources Management, 2018, 32 : 2369 - 2383
  • [2] The probabilistic assessment of overtopping reliability on Akyayik dam
    Erdik, T.
    Duricic, J.
    van Gelder, P. H. A. J. M.
    KSCE JOURNAL OF CIVIL ENGINEERING, 2013, 17 (07) : 1810 - 1819
  • [3] The probabilistic assessment of overtopping reliability on Akyayik dam
    T. Erdik
    J. Duricic
    P. H. A. J. M. van Gelder
    KSCE Journal of Civil Engineering, 2013, 17 : 1810 - 1819
  • [4] Assessment of overtopping reliability and benefits of a flood detention dam
    Yanmaz, A. Melih
    Gunindi, M. Engin
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2008, 35 (10) : 1177 - 1182
  • [5] Strategic Assessment of Dam Overtopping Reliability Using a Stochastic Process Approach
    Sharafati, Ahmad
    Yaseen, Zaher Mundher
    Pezeshki, Elnaz
    JOURNAL OF HYDROLOGIC ENGINEERING, 2020, 25 (07)
  • [6] An assessment of Bengoh dam overtopping scenario
    Hwee, Heng Hock
    Poon, Hii Ching
    Tze, Kho Kai
    GEOMATICS NATURAL HAZARDS & RISK, 2014, 5 (02) : 115 - 131
  • [7] Assessment of Flood Hazard Caused by Overtopping of a Dam
    Yilmaz, Kutay
    Karaman, Cagri Hasan
    PROCEEDINGS OF THE 39TH IAHR WORLD CONGRESS, 2022, : 6638 - 6645
  • [8] Dam overtopping risk assessment considering inspection program
    Kuo, Jan-Tai
    Hsu, Yung-Chia
    Tung, Yeou-Koung
    Yeh, Keh-Chia
    Wu, Jian-De
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2008, 22 (03) : 303 - 313
  • [9] Risk Assessment of Tailings Dam Break Due to Overtopping
    Zheng, Xin
    Wei, Yong
    Xu, K. L.
    An, H. M.
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (07): : 1641 - 1649
  • [10] Dam overtopping risk assessment considering inspection program
    Jan-Tai Kuo
    Yung-Chia Hsu
    Yeou-Koung Tung
    Keh-Chia Yeh
    Jian-De Wu
    Stochastic Environmental Research and Risk Assessment, 2008, 22 : 303 - 313