Computer Simulation Forecast of the Markov Chain for Payback Period of Construction Projects Investment

被引:0
|
作者
Zhang, MengFang [1 ]
Huang, Liang [1 ]
Shan, LuYang [1 ]
机构
[1] Zhejiang Univ Technol, Coll Architecture & Civil Engn, Hangzhou 310032, Zhejiang, Peoples R China
来源
CONSTRUCTION AND URBAN PLANNING, PTS 1-4 | 2013年 / 671-674卷
关键词
Markov Chain; Payback Period of Investment; Computer Simulation; Investment Risk; Construction Projects;
D O I
10.4028/www.scientific.net/AMR.671-674.3096
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The investment payback period of construction projects is an important index that evaluate and measure economic effect of project investment. It is difficult that the investment payback period of construction projects is calculated generally using analytic method. We established the mathematical model of the payback period, the annual net cash flows are Markov chains. According to the similar projects, collected net yearly cash flow and each quarter net cash flow, A one-step transition probability matrix was described by using the computer simulation of Markov chains, forecasted the dynamic and static payback period of construction projects investment, so as to provide the scientific basis data for decision makers.
引用
收藏
页码:3096 / 3099
页数:4
相关论文
共 19 条
  • [1] Forecast on Payback Period of Restaurant Projects Investment by Computer Simulation
    Zhang, MengFang
    Huang, Liang
    Cai, YiPing
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 3782 - +
  • [2] Simulation prediction model for payback period of industrial construction project
    Sai, Yunxiu
    Wang, Weiran
    Fang, Xing
    MODELING AND COMPUTATION IN ENGINEERING II, 2013, : 225 - 229
  • [3] Risk Analysis of Construction Projects Based on Markov Chain
    Zhang Sujiao
    2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 1, PROCEEDINGS, 2009, : 514 - 517
  • [4] The risk simulation of investment on construction projects in the absence of historical data
    Hu, Changming
    Guo, Jianfeng
    Wang, Jianping
    Jiang, Hongyan
    2006 XI'AN INTERNATIONAL CONFERENCE OF ARCHITECTURE AND TECHNOLOGY, PROCEEDINGS: ARCHITECTURE IN HARMONY, 2006, : 991 - 995
  • [5] Based on Markov chain of agricultural enterprise risk investment profit forecast economic model
    Bin, Ouyang
    Advance Journal of Food Science and Technology, 2014, 6 (01) : 26 - 28
  • [6] Simphony Supply Chain Simulator: a simulation toolkit to model the supply chain of construction projects
    Ebrahimy, Yasser
    AbouRizk, Simaan M.
    Fernando, Siri
    Mohamed, Yasser
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2011, 87 (08): : 657 - 667
  • [7] Analysis of duration and cost estimate of construction projects through computer simulation
    Dukic, Darko
    Maric, Tamara
    Babic, Dubravka
    PROCEEDINGS OF THE ITI 2007 29TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY INTERFACES, 2007, : 107 - +
  • [8] Application of Markov Chain Techniques for Selecting Efficient Financial Stocks for Investment Portfolio Construction
    Kallah-Dagadu, Gabriel
    Apatu, Victor
    Mettle, Felix Okoe
    Arku, Dennis
    Debrah, Godwin
    JOURNAL OF APPLIED MATHEMATICS, 2022, 2022
  • [9] Multimethod Supply Chain Simulation Model for High-Rise Building Construction Projects
    Jung, Minhyuk
    Park, Moonseo
    Lee, Hyun-Soo
    Chi, Seokho
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2018, 32 (03)
  • [10] Robustness analysis of underground powerhouse construction simulation based on Markov Chain Monte Carlo method
    ZHONG DengHua
    BI Lei
    YU Jia
    ZHAO MengQi
    Science China(Technological Sciences), 2016, 59 (02) : 252 - 264