共 50 条
- [2] A dispatching algorithm considering process quality and due dates: an application for re-entrant production lines INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (1-4): : 249 - 259
- [3] A dispatching algorithm considering process quality and due dates: an application for re-entrant production lines Shin, Hyun Joon, 1600, Springer London (77): : 1 - 4
- [4] A dispatching algorithm considering process quality and due dates: an application for re-entrant production lines The International Journal of Advanced Manufacturing Technology, 2015, 77 : 249 - 259
- [5] New heuristic for scheduling re-entrant production lines CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 199 - +
- [8] Translating output specifications to production flow requirements for re-entrant lines Proceedings of the IEEE Conference on Decision and Control, 1998, 2 : 2160 - 2165
- [9] Translating output specifications to production flow requirements for re-entrant lines PROCEEDINGS OF THE 37TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1998, : 2160 - 2165
- [10] Control of manufacturing systems with re-entrant lines MATHEMATICAL MODELS & METHODS IN APPLIED SCIENCES, 1996, 6 (02): : 195 - 215