Monitoring foreclosure rates with a spatially risk-adjusted Bernoulli CUSUM chart for concurrent observations

被引:5
|
作者
Keefe, Matthew J. [1 ,2 ]
Franck, Christopher T. [1 ,2 ]
Woodall, William H. [1 ]
机构
[1] Virginia Tech, Dept Stat, Blacksburg, VA USA
[2] Virginia Ctr Housing Res, Blacksburg, VA USA
基金
美国国家科学基金会;
关键词
Cumulative sum; mortgage default; kernel density estimation; spatial risk-adjustment; statistical process monitoring; Wayne County; WEIGHTED MOVING AVERAGE; REGRESSION APPROACH; FINANCIAL CRISIS; MORTGAGE MARKET; CARDIAC-SURGERY; HETEROGENEITY; PERFORMANCE; IMPROVEMENT; SUBPRIME; DEFAULT;
D O I
10.1080/02664763.2016.1169257
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
Frequently in process monitoring, situations arise in which the order that events occur cannot be distinguished, motivating the need to accommodate multiple observations occurring at the same time, or concurrent observations. The risk-adjusted Bernoulli cumulative sum (CUSUM) control chart can be used to monitor the rate of an adverse event by fitting a risk-adjustment model, followed by a likelihood ratio-based scoring method that produces a statistic that can be monitored. In our paper, we develop a risk-adjusted Bernoulli CUSUM control chart for concurrent observations. Furthermore, we adopt a novel approach that uses a combined mixture model and kernel density estimation approach in order to perform risk-adjustment with regard to spatial location. Our proposed method allows for monitoring binary outcomes through time with multiple observations at each time point, where the chart is spatially adjusted for each Bernoulli observation's estimated probability of the adverse event. A simulation study is presented to assess the performance of the proposed monitoring scheme. We apply our method using data from Wayne County, Michigan between 2005 and 2014 to monitor the rate of foreclosure as a percentage of all housing transactions.
引用
收藏
页码:325 / 341
页数:17
相关论文
共 50 条
  • [1] Improved implementation of the risk-adjusted Bernoulli CUSUM chart to monitor surgical outcome quality
    Keefe, Matthew J.
    Loda, Justin B.
    Elhabashy, Ahmad E.
    Woodall, William H.
    [J]. INTERNATIONAL JOURNAL FOR QUALITY IN HEALTH CARE, 2017, 29 (03) : 343 - 348
  • [2] A new phase II risk-adjusted CUSUM chart for monitoring surgical performance
    Li, Longhui
    Liu, Yanli
    Shang, Yanfen
    Liu, Zixian
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 186
  • [3] Dynamic probability control limits for risk-adjusted Bernoulli CUSUM charts
    Zhang, Xiang
    Woodall, William H.
    [J]. STATISTICS IN MEDICINE, 2015, 34 (25) : 3336 - 3348
  • [4] Applying of risk-adjusted CUSUM control chart monitoring of medical information in shoulder surgery study
    Chiu, Jing-Er
    Chen, Zi-Hsuan
    Tsai, Hung-Hao
    [J]. 2013 10TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2013, : 792 - 794
  • [5] A new risk-adjusted Bernoulli cumulative sum chart for monitoring binary health data
    Rossi, Giuseppe
    Del Sarto, Simone
    Marchi, Marco
    [J]. STATISTICAL METHODS IN MEDICAL RESEARCH, 2016, 25 (06) : 2704 - 2713
  • [6] Monitoring therapeutic processes using risk-adjusted multivariate Tukey's CUSUM control chart
    Kazemi, Sina
    Noorossana, Rassoul
    Rasouli, Mohammad
    Nayebpour, Mohamad R.
    Heidari, Kamran
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2021, 37 (06) : 2818 - 2833
  • [7] Assessing the effect of estimation error on risk-adjusted CUSUM chart performance
    Jones, Mark A.
    Steiner, Stefan H.
    [J]. INTERNATIONAL JOURNAL FOR QUALITY IN HEALTH CARE, 2012, 24 (02) : 176 - 181
  • [8] Risk-adjusted frailty-based CUSUM control chart for phase I monitoring of patients' lifetime
    Keshavarz, Maryam
    Asadzadeh, Shervin
    Niaki, Seyed Taghi Akhavan
    [J]. JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2021, 91 (02) : 334 - 352
  • [9] The Effect of Estimation Error on Risk-Adjusted Survival Time CUSUM Chart Performance
    Zhang, Min
    Xu, Yahui
    He, Zhen
    Hou, Xuejun
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2016, 32 (04) : 1445 - 1452
  • [10] Reduction of the Effect of Estimation Error on In- control Performance for Risk-adjusted Bernoulli CUSUM Chart with Dynamic Probability Control Limits
    Zhang, Xiang
    Woodall, William H.
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2017, 33 (02) : 381 - 386