摘要
The I & C (Instrumentation and Control) design of the CVCS (Chemical and Volume Control System) for the EPR (TM) nuclear power plant in Taishan (TSN NPP) is shortly introduced and the corresponding I & C module assignment procedure, according to the functional safety class principle, is described An example of the I & C module assignment procedure is given for a control loop of the CVCS. In addition, the corresponding advantages and drawbacks are described and discussed The approach described introduces a new method for the concerned I & C design by improving the interface between the system, process, and I & C engineering design. In fact, a fruitful collaboration was reached between the system and I & C design for the EPR (TM) project in Taishan, for the concerned interface.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] CEPR core design and fuel management in Taishan nuclear power plant
    Wang, Yonggang
    Xiang, Wenxin
    Yao, Bo
    Lyu, Yunjiang
    Hedongli Gongcheng/Nuclear Power Engineering, 2015, 36 : 51 - 53
  • [2] Verification of specific activity of 16N in the primary loop of Taishan EPR nuclear power plant
    郑华
    核科学与工程, 2011, (03) : 212 - 215
  • [3] Analysis on temperature filed of outer containment of the Taishan Nuclear Power Plant
    Qian, Hongliang
    Qin, Feng
    Fan, Feng
    Li, Tao
    Li, Zheng
    Jin, Xiaofei
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2014, 35 (07): : 115 - 122
  • [4] STUDY OF STATION BLACKOUT ACCIDENT PROCESS IN TAISHAN NUCLEAR POWER PLANT
    Li, Yu
    Zhang, Huiyong
    Liao, Yehong
    Lin, Jiming
    Zhan, Dekui
    PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 1, 2014,
  • [5] NUCLEAR-POWER PLANT CONSTRUCTION - OVERVIEW
    MASON, GE
    GONZALEZ, MA
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1978, 104 (04): : 463 - 478
  • [6] RFI EFFECTS ON NUCLEAR-POWER PLANT I AND C EQUIPMENT
    ORANCHAK, JR
    GARG, HC
    ATHAVALE, SV
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1980, 27 (01) : 863 - 865
  • [7] STOCHASTIC APPROACH FOR THE SEISMIC DESIGN OF NUCLEAR-POWER-PLANT EQUIPMENTS
    LABBE, P
    NOE, H
    NUCLEAR ENGINEERING AND DESIGN, 1991, 129 (03) : 367 - 379
  • [8] STUDY ON THE APPLICATION OF CDAG METHODOLOGY IN EPR NUCLEAR POWER PLANT
    Yin Yuhao
    Huang Yichao
    Zhao Feng
    PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2017, VOL 7, 2017,
  • [9] EVOLUTION OF NUCLEAR POWER PLANT DESIGN
    HINTON, C
    NATURE, 1960, 187 (4743) : 1064 - 1070
  • [10] Building of a CAD system for I&C system of nuclear power plant
    Ma, Zhi-Cai
    Zhang, Dong-Sheng
    Hedongli Gongcheng/Nuclear Power Engineering, 2013, 34 (04): : 168 - 170