共 50 条
- [1] CEPR core design and fuel management in Taishan nuclear power plant Hedongli Gongcheng/Nuclear Power Engineering, 2015, 36 : 51 - 53
- [3] Analysis on temperature filed of outer containment of the Taishan Nuclear Power Plant Jianzhu Jiegou Xuebao/Journal of Building Structures, 2014, 35 (07): : 115 - 122
- [4] STUDY OF STATION BLACKOUT ACCIDENT PROCESS IN TAISHAN NUCLEAR POWER PLANT PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 1, 2014,
- [5] NUCLEAR-POWER PLANT CONSTRUCTION - OVERVIEW JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1978, 104 (04): : 463 - 478
- [8] STUDY ON THE APPLICATION OF CDAG METHODOLOGY IN EPR NUCLEAR POWER PLANT PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2017, VOL 7, 2017,
- [10] Building of a CAD system for I&C system of nuclear power plant Hedongli Gongcheng/Nuclear Power Engineering, 2013, 34 (04): : 168 - 170