Engineering Negative Cycle Canceling for Wind Farm Cabling

被引:1
|
作者
Gritzbach, Sascha [1 ]
Ueckerdt, Torsten [1 ]
Wagner, Dorothea [1 ]
Wegner, Franziska [1 ]
Wolf, Matthias [1 ]
机构
[1] Karlsruhe Inst Technol, Karlsruhe, Germany
关键词
Negative Cycle Canceling; Step Cost Function; Wind Farm Planning; OPTIMIZATION; ALGORITHMS;
D O I
10.4230/LIPIcs.ESA.2019.55
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
In a wind farm turbines convert wind energy into electrical energy. The generation of each turbine is transmitted, possibly via other turbines, to a substation that is connected to the power grid. On every possible interconnection there can be at most one of various different cable types. Each cable type comes with a cost per unit length and with a capacity. Designing a cost-minimal cable layout for a wind farm to feed all turbine production into the power grid is called the Wind Farm Cabling Problem (WCP). We consider a formulation of WCP as a flow problem on a graph where the cost of a flow on an edge is modeled by a step function originating from the cable types. Recently, we presented a proof-of-concept for a negative cycle canceling-based algorithm for WCP [14]. We extend key steps of that heuristic and build a theoretical foundation that explains how this heuristic tackles the problems arising from the special structure of WCP. A thorough experimental evaluation identifies the best setup of the algorithm and compares it to existing methods from the literature such as MIXED-INTEGER LINEAR PROGRAMMING (MILP) and Simulated Annealing (SA). The heuristic runs in a range of half a millisecond to under two minutes on instances with up to 500 turbines. It provides solutions of similar quality compared to both competitors with running times of one hour and one day. When comparing the solution quality after a running time of two seconds, our algorithm outperforms the MILP- and SA-approaches, which allows it to be applied in interactive wind farm planning.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Towards negative cycle canceling in wind farm cable layout optimization
    Gritzbach S.
    Ueckerdt T.
    Wagner D.
    Wegner F.
    Wolf M.
    Energy Informatics, 1 (Suppl 1) : 183 - 193
  • [2] Publisher Correction: Towards negative cycle canceling in wind farm cable layout optimization
    Sascha Gritzbach
    Torsten Ueckerdt
    Dorothea Wagner
    Franziska Wegner
    Matthias Wolf
    Energy Informatics, 1 (1)
  • [3] Optimal Wind Farm Cabling
    Gong, Xuan
    Kuenzel, Stefanie
    Pal, Bikash C.
    2020 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2020,
  • [4] Optimal Wind Farm Cabling
    Gong, Xuan
    Kuenzel, Stefanie
    Pal, Bikash C.
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2018, 9 (03) : 1126 - 1136
  • [5] Offshore wind farm cabling: incidents and required learning
    Boehme, Thomas
    Robson, David J.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-FORENSIC ENGINEERING, 2012, 165 (04)
  • [6] Joint Optimization of Wind Turbine Micrositing and Cabling in an Offshore Wind Farm
    Tao S.
    Xu Q.
    Feijoo A.
    Zheng G.
    Tao, Siyu (230188145@seu.edu.cn), 1600, Institute of Electrical and Electronics Engineers Inc. (12): : 834 - 844
  • [7] A Simulated-Annealing-Based Approach for Wind Farm Cabling
    Lehmann, Sebastian
    Rutter, Ignaz
    Wagner, Dorothea
    Wegner, Franziska
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON FUTURE ENERGY SYSTEMS (E-ENERGY'17), 2017, : 203 - 215
  • [8] Co-optimisation of wind farm micro-siting and cabling layouts
    Al Shereiqi, A.
    Mohandes, B.
    Al-Hinai, A.
    Bakhtvar, M.
    Al-Abri, R.
    El Moursi, M. S.
    Albadi, M.
    IET RENEWABLE POWER GENERATION, 2021, 15 (08) : 1848 - 1860
  • [9] Life cycle assessment of a wind farm in Turkey
    Buse Ozsahin
    Nilay Elginoz
    Fatos Germirli Babuna
    Environmental Science and Pollution Research, 2022, 29 : 71000 - 71013
  • [10] Life cycle assessment of a wind farm in Turkey
    Ozsahin, Buse
    Elginoz, Nilay
    Germirli Babuna, Fatos
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (47) : 71000 - 71013