Unrelated parallel-machine scheduling problems with multiple rate-modifying activities

被引:27
|
作者
Yang, Dar-Li [1 ]
Yang, Suh-Jenq [2 ]
机构
[1] Natl Formosa Univ, Dept Informat Management, Yunlin 632, Taiwan
[2] Nan Kai Univ Technol, Dept Ind Engn & Management, Nan Tou 542, Taiwan
关键词
Scheduling; Unrelated parallel-machine; Multiple rate-modifying activities; Total completion time; Total machine load; MINIMIZE;
D O I
10.1016/j.ins.2013.02.013
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this article we investigate scheduling problems with multiple rate-modifying activities on an unrelated parallel-machine setting. We assume that each machine may have multiple rate-modifying activities. The goal is to determine jointly the optimal rate-modifying activity frequencies, the optimal rate-modifying activity positions, and the optimal schedule to minimize the total completion time and the total machine load, respectively. If the number of machines is fixed, we propose two efficient polynomial time algorithms for solving both problems no matter what the processing time of a job scheduled after a rate-modifying activity is greater or less than its processing time scheduled before the rate-modifying activity. (C) 2013 Elsevier Inc. All rights reserved.
引用
收藏
页码:280 / 286
页数:7
相关论文
共 50 条
  • [1] Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time
    Hsu, Chou-Jung
    Cheng, T. C. E.
    Yang, Dar-Li
    [J]. INFORMATION SCIENCES, 2011, 181 (20) : 4799 - 4803
  • [2] Unrelated parallel-machine scheduling simultaneously with rate-modifying activities and earliness and tardiness penalties
    Yang, Dar-Li
    Lee, Hsin-Tao
    Yang, Suh-Jenq
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2012, 29 (04) : 282 - 289
  • [3] Note on "Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time"
    Yang, Suh-Jenq
    Hsu, Chou-Jung
    Yang, Dar-Li
    [J]. INFORMATION SCIENCES, 2014, 260 : 215 - 217
  • [4] Parallel-machine scheduling with deteriorating jobs and rate-modifying activities to minimize total completion time
    Zhao, Chuan-Li
    Guo, Jia-Yuarn
    Hsu, Chou-Jung
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2011, 28 (06) : 485 - 491
  • [5] Multitasking scheduling with multiple rate-modifying activities
    Zhu, Zhanguo
    Liu, Ming
    Chu, Chengbin
    Li, Jinlin
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2019, 26 (05) : 1956 - 1976
  • [6] A study on identical parallel machine scheduling with deterioration and rate-modifying activities
    [J]. Kim, Byung Soo (bskim@inu.ac.kr), 2016, ICIC Express Letters Office (07):
  • [7] Unrelated parallel-machine scheduling with deteriorating maintenance activities
    Cheng, T. C. E.
    Hsu, Chou-Jung
    Yang, Dar-Li
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 60 (04) : 602 - 605
  • [8] Unrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activities
    Hsu, Chou-Jung
    Ji, Min
    Guo, Jia-Yuarn
    Yang, Dar-Li
    [J]. INFORMATION SCIENCES, 2013, 253 : 163 - 169
  • [9] Machine scheduling problems under deteriorating effects and deteriorating rate-modifying activities
    Zhang, Xingong
    Wu, Wen-Hsiang
    Lin, Win-Chin
    Wu, Chin-Chia
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2018, 69 (03) : 439 - 448
  • [10] UNRELATED-PARALLEL MACHINE SCHEDULING WITH SIMULTANEOUS CONSIDERATIONS OF RESOURCE-DEPENDENT PROCESSING TIMES AND RATE-MODIFYING ACTIVITIES
    Chang, Teng-Ruey
    Lee, Hsin-Tao
    Yang, Dar-Li
    Yang, Suh-Jenq
    [J]. INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2014, 10 (04): : 1587 - 1600