共 7 条
- [5] Construction perfoamnce of EPB shield tunnels on channel rail link contract 220 in London NEW FRONTIERS IN CHINESE AND JAPANESE GEOTECHNIQUES, 2007, : 170 - 180
- [6] Evaluation of prop loads at Channel Tunnel Rail Link Contract 430 - Ashford tunnels Ground Engineering, 2001, 34 (08): : 38 - 42
- [7] Overview of initial ground investigations for the Channel Tunnel high speed rail link ADVANCES IN SITE INVESTIGATION PRACTICE, 1996, : 119 - 144