Scheduling projects with heterogeneous resources to meet time and quality objectives

被引:51
|
作者
Tiwari, Vikram [1 ]
Patterson, James H. [2 ]
Mabert, Vincent A. [2 ]
机构
[1] Univ Houston, Coll Technol, Informat & Logist Technol Dept, Houston, TX 77204 USA
[2] Indiana Univ, Kelley Sch Business, Bloomington, IN 47405 USA
关键词
Project scheduling; Combinatorial optimization; Multi-mode; Heterogeneous resources; Service quality; Rework; ALGORITHM; COST;
D O I
10.1016/j.ejor.2007.11.005
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In service organizations, heterogeneity in workforce skills can lead to variation in end-product/service quality. The multi-mode, resource-constrained, project scheduling problem (MRCPSP), which assumes similar skills among resources in a given resource pool, accounts for differences in quality levels of individuals by assigning different activity durations depending on the skill level used. This approach is often inadequate to model the problem type investigated here. Using typical projects from the customer training division of a large telecommunications company (which motivated this research), a labor assignment problem using a successive work-time concept is formulated and solved using integer programming optimization procedures. The setting represents a multiple-project environment where projects are separate and independent, but require the same renewable resource mix for their completion. The paper demonstrates how the output of the model can be used to identify bottlenecks (or critical resource skills), and also demonstrates how cross-training the appropriately skilled groups or individuals can increase throughput. The approach guides decision-making concerning which workers to cross-train in order to extract the greatest benefits from worker-flexibility. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:780 / 790
页数:11
相关论文
共 50 条
  • [1] Scheduling construction projects with resources accessibility limited and changeable in time
    Jaskowski, P
    Sobotka, A
    8TH INTERNATIONAL CONFERENCE ON MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 2004, : 199 - 209
  • [2] Resource Constraint Project Scheduling to Meet Net Present Value and Quality Objectives of the Program
    Rad, M. Salimi
    Jamili, A.
    Tavakkoli-Moghaddam, R.
    Paknahad, M.
    2016 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING (ICIE), 2016,
  • [3] Mathematical Programming and Financial Objectives for Scheduling Projects
    Salah Elmaghraby
    Journal of Scheduling, 2005, 8 (6) : 543 - 546
  • [4] A robust scheduling of projects with time, cost, and quality considerations
    Ali Salmasnia
    Hadi Mokhtari
    Isa Nakhai Kamal Abadi
    The International Journal of Advanced Manufacturing Technology, 2012, 60 : 631 - 642
  • [5] A robust scheduling of projects with time, cost, and quality considerations
    Salmasnia, Ali
    Mokhtari, Hadi
    Abadi, Isa Nakhai Kamal
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (5-8): : 631 - 642
  • [6] A robust scheduling of projects with time, cost, and quality considerations
    Salmasnia, Ali
    Mokhtari, Hadi
    Kamal Abadi, Isa Nakhai
    International Journal of Advanced Manufacturing Technology, 2012, 60 (5-8): : 631 - 642
  • [7] Dynamic Scheduling for Heterogeneous Resources with Time Windows and Precedence Relation
    Liu, Shudong
    Kurniawan, Ernest
    Tan, Peng Hui
    Zhang, Peng
    Sun, Sumei
    Ye, Sarah
    TENCON 2017 - 2017 IEEE REGION 10 CONFERENCE, 2017, : 3045 - 3050
  • [8] SCHEDULING OF JOB RESOURCES IN MULTIUNIT PROJECTS WITH THE USE OF TIME/COST CRITERIA
    Podolski, M.
    ARCHIVES OF CIVIL ENGINEERING, 2016, 62 (01) : 143 - 158
  • [9] Scheduling Limited Resources in Engineering Projects
    Ben Issaa, Samer
    Tu, Yiliu
    SEVENTEENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, 2018, : 88 - 98
  • [10] A note on scheduling to meet two min-sum objectives
    Angel, Eric
    Bampis, Evripidis
    Fishkin, Aleksei V.
    OPERATIONS RESEARCH LETTERS, 2007, 35 (01) : 69 - 73