共 50 条
- [1] Scheduling construction projects with resources accessibility limited and changeable in time 8TH INTERNATIONAL CONFERENCE ON MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 2004, : 199 - 209
- [2] Resource Constraint Project Scheduling to Meet Net Present Value and Quality Objectives of the Program 2016 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING (ICIE), 2016,
- [4] A robust scheduling of projects with time, cost, and quality considerations The International Journal of Advanced Manufacturing Technology, 2012, 60 : 631 - 642
- [5] A robust scheduling of projects with time, cost, and quality considerations INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (5-8): : 631 - 642
- [6] A robust scheduling of projects with time, cost, and quality considerations International Journal of Advanced Manufacturing Technology, 2012, 60 (5-8): : 631 - 642
- [7] Dynamic Scheduling for Heterogeneous Resources with Time Windows and Precedence Relation TENCON 2017 - 2017 IEEE REGION 10 CONFERENCE, 2017, : 3045 - 3050
- [9] Scheduling Limited Resources in Engineering Projects SEVENTEENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, 2018, : 88 - 98