Use of microcracking to reduce shrinkage cracking in cement-treated bases

被引:0
|
作者
Sebesta, S [1 ]
机构
[1] Texas A&M Univ Syst, Texas Transportat Inst, College Stn, TX 77843 USA
来源
SOIL MECHANICS 2005 | 2005年 / 1936期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Shrinkage cracking occurs in cement-treated bases because of desiccation and cement hydration; eventually these cracks start to reflect through the pavement surfacing. Although initially considered cosmetic. these cracks open the pavement to water infiltration and increase the likelihood of accelerated pavement distress. Numerous options exist for minimizing the amount of reflective cracks that appear; microcracking is a promising approach. The microcracking concept can be defined as the application of several vibratory roller passes to the cement-treated base at a short curing stage, typically after 1 to 3 days. to create a fine network of cracks. In addition to the microcracked test sites, the contractor constructed moist-cured, dry-cured, and asphalt membrane-cured sites for comparison. Researchers used falling weight deflectometer (FWD) tests to control the microcracking process, periodic crack surveys to monitor crack performance, and FWD tests through time to track base moduli. Microcracking proved quite effective at reducing shrinkage cracking problems in the base; applying the procedure with three passes of the roller after 2 to 3 days of curing resulted in the best performance. In addition, researchers observed that, without microcracking, excessively high cement contents resulted in problematic cracking in the base even if they were cured according to good construction practice. Microcracking did not result in pavement damage or diminished in-service modulus; thus, microcracking should be considered a viable and inexpensive option to incorporate shrinkage crack control into the construction of cement-treated bases.
引用
收藏
页码:3 / 11
页数:9
相关论文
共 50 条
  • [1] Effect of microcracking on the shrinkage cracking and durability performance of cement-treated macadam material
    He, Miao
    Ma, Shibin
    Liu, Cui
    Zhang, Jing
    Yuan, Shuaishuai
    [J]. INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2022, 23 (14) : 4909 - 4922
  • [2] Sulfate attack in cement-treated bases
    Ksaibati, K.
    Huntington, G.
    [J]. Road and Transport Research, 1999, 8 (01): : 29 - 41
  • [3] Mesoscale Cracking of Cement-treated Composites with Initial Defects
    考虑初始缺陷的水泥基复合材料细观开裂研究
    [J]. Dong, Qiao (qiaodong@seu.edu.cn), 1600, Chang'an University (33): : 230 - 239
  • [4] Recycled waste materials as additives in cement-treated bases
    Rahim, Ashraf
    [J]. EFFICIENT TRANSPORTATION AND PAVEMENT SYSTEMS: CHARACTERIZATION, MECHANISMS, SIMULATION, AND MODELING, 2009, : 899 - 905
  • [5] Development of cement-treated base material for reducing shrinkage cracks
    Cho, Yoon-Ho
    Lee, Kang-Won
    Ryu, Sung-Woo
    [J]. GEOMATERIALS 2006, 2006, 1952 : 134 - 143
  • [6] Fatigue cracking of cement-treated composites with mesoscale heterogeneous model
    Zhao, Xiaokang
    Dong, Qiao
    Xiao, Yuanjie
    Du, Hui
    Jia, Yanshun
    [J]. Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2021, 52 (09): : 3132 - 3142
  • [7] MECHANISM OF SHRINKAGE CRACKING OF SOIL-CEMENT BASES.
    George, K.P.
    [J]. Highway Research Record, 1973, (442): : 1 - 10
  • [8] Test and estimate control on temperature shrinkage performance of cement-treated macadam
    School of Transportation, Southeast University, Nanjing 210096, China
    [J]. Dongnan Daxue Xuebao, 2008, 2 (260-264):
  • [9] Research on Dry-shrinkage Performance of Cement-treated Base Materials
    Wang Yan
    Ni Fujian
    Xuan Weihong
    [J]. MATERIAL, DESIGN, CONSTRUCTION, MAINTENANCE, AND TESTING OF PAVEMENT, 2009, (193): : 81 - +
  • [10] Effect of Pavement Responses on Fatigue Cracking and Cement-Treated Reflective Cracking Failure Mechanisms
    Dhakal, Nirmal
    Elseifi, Mostafa
    Al-Qadi, Imad L.
    Rupnow, Tyson
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING PART B-PAVEMENTS, 2021, 147 (04)