A novel methodology for the design of waste heat recovery network in eco-industrial park using techno-economic analysis and multi-objective optimization

被引:43
|
作者
Zhang, Chuan [1 ,2 ]
Zhou, Li [2 ,3 ]
Chhabra, Pulkit [2 ,3 ]
Garud, Sushant S. [2 ,3 ]
Aditya, Kevin [2 ]
Romagnoli, Alessandro [1 ,2 ]
Comodi, Gabriele [4 ]
Dal Magro, Fabio [1 ]
Meneghetti, Antonella [5 ]
Kraft, Markus [2 ,6 ,7 ]
机构
[1] Nanyang Technol Univ, Sch Mech & Aerosp Engn, 50 Nanyang Ave, Singapore, Singapore
[2] Cambridge Ctr Adv Res Energy Efficiency Singapore, 1 Create Way, Singapore, Singapore
[3] Natl Univ Singapore, Dept Chem & Biomol Engn, 4 Engn Dr 4, Singapore, Singapore
[4] Univ Politecn Marche, Dept Ind Engn & Math Sci, Ancona, Italy
[5] Univ Udine, Dipartimento Ingn Elettr Gest & Meccan, I-33100 Udine, Italy
[6] Univ Cambridge, Dept Chem Engn & Biotechnol, Pembroke St, Cambridge CB2 3RA, England
[7] Nanyang Technol Univ, Sch Chem & Biomed Engn, 62 Nanyang Dr, Singapore, Singapore
基金
新加坡国家研究基金会;
关键词
Waste heat recovery; Eco industrial park; Techno-economic-environmental modelling; Multi-objective optimization; ENERGY; SYSTEMS; SYMBIOSIS;
D O I
10.1016/j.apenergy.2016.10.016
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Based on share of energy, materials, resources and information, Eco Industrial Park (EIP) has become a popular form of industry cluster. Waste Heat Recovery (WHR) in EIP can significantly increase the total energy efficiency of the whole park, meanwhile reducing its greenhouse gas emission. The current paper proposes a methodology to assess the opportunities of WHR in EIP at park level. Four different steps are included in this methodology. The first step is identification of waste heat source plants and sink plants in EIP; the second step is the establishment of the waste heat transportation system; the third step is a Single-Objective Optimization Problem (SOOP); the fourth step is Multi-Objective Optimization Problem (MOOP). An EIP on Jurong Island Singapore comprising of five plants and two communities is used as a case study to demonstrate the capability of this methodology. Two different operation modes for the EIP are considered: with continuous waste heat and with discontinuous waste heat over time. The first scenario shows that SOOP and MOOP will deliver different WHR networks; the second scenario shows that waste heat discontinuity has great influence on the optimization of the WHR network. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:88 / 102
页数:15
相关论文
共 50 条
  • [1] Optimization of a waste heat utilization network in an eco-industrial park
    Chae, Song Hwa
    Kim, Sang Hun
    Yoon, Sung-Geun
    Park, Sunwon
    [J]. APPLIED ENERGY, 2010, 87 (06) : 1978 - 1988
  • [2] Techno-economic and multi-objective optimization of a hydrogen liquefaction plant based on RBC integrated with ORC for waste heat recovery
    Ghamati, Erfan
    Khiadani, Mehdi
    Das, Barun
    [J]. INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2024, 83 : 1349 - 1358
  • [3] Techno-economic analysis of novel multi-objective soft computing technique
    Das, Gourab
    [J]. INTERNATIONAL JOURNAL OF BIO-INSPIRED COMPUTATION, 2022, 20 (03) : 172 - 182
  • [4] Techno-economic optimization of the industrial excess heat recovery for an industrial park with high spatial and temporal resolution
    Kumar, Shravan
    Thakur, Jagruti
    Cunha, Jose Maria
    Gardumi, Francesco
    Kok, Ali
    Lisboa, Andre
    Martin, Viktoria
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2023, 287
  • [5] Design of sustainable and resilient eco-industrial parks: Planning the flows integration network through multi-objective optimization
    Valenzuela-Venegas, Guillermo
    Vera-Hofmann, Gabriela
    Diaz-Alvarado, Felipe A.
    [J]. JOURNAL OF CLEANER PRODUCTION, 2020, 243
  • [6] Techno-economic and techno-environmental assessment and multi-objective optimization of a new CCHP system based on waste heat recovery from regenerative Brayton cycle
    Wang, Aili
    Wang, Shunsheng
    Ebrahimi-Moghadam, Amir
    Farzaneh-Gord, Mahmood
    Moghadam, Ali Jabari
    [J]. ENERGY, 2022, 241
  • [7] Multi-objective optimization for resource network synthesis in eco-industrial parks using an integrated analytic hierarchy process
    Leong, Yik Teeng
    Lee, Jui-Yuan
    Tan, Raymond R.
    Foo, Ji Jinn
    Chew, Irene Mei Leng
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 143 : 1268 - 1283
  • [8] Techno-economic design of hybrid electric vehicles and possibilities of the multi-objective optimization structure
    Dimitrova, Zlatina
    Marechal, Francois
    [J]. APPLIED ENERGY, 2016, 161 : 746 - 759
  • [9] Techno-Economic Analysis of Waste Heat Recovery with ORC from Fluctuating Industrial Sources
    Pili, Roberto
    Romagnoli, Alessandro
    Spliethoff, Hartmut
    Wieland, Christoph
    [J]. 4TH INTERNATIONAL SEMINAR ON ORC POWER SYSTEMS, 2017, 129 : 503 - 510
  • [10] Sustainable planning and design for eco-industrial parks using integrated multi-objective optimization and fuzzy analytic hierarchy process
    Wattanasaeng, Niroot
    Ransikarbum, Kasin
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2024, 41 (03) : 256 - 275