Age replacement policy with lead-time for a system subject to non-homogeneous pure birth shocks

被引:15
|
作者
Sheu, Shey-Huei [1 ,2 ]
Zhang, Zhe George [3 ,4 ]
Chien, Yu-Hung [5 ]
Huang, Tsun-Hung [6 ]
机构
[1] Providence Univ, Dept Stat & Informat Sci, Taichung 433, Taiwan
[2] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
[3] Western Washington Univ, Dept Decis Sci, Bellingham, WA 98225 USA
[4] Simon Fraser Univ, Dept Beedie Sch Business, Burnaby, BC V5A 1S6, Canada
[5] Natl Taichung Univ Sci & Technol, Dept Appl Stat, Taichung 40401, Taiwan
[6] Natl Chin Yi Univ Technol, Dept Ind Engn & Management, Taichung 41101, Taiwan
基金
加拿大自然科学与工程研究理事会;
关键词
Maintenance; Replacement; Repair; Pure birth process; Lead time; Shock model; Optimization; MINIMAL REPAIR COSTS; SPARE ORDERING POLICY; PERIODIC REPLACEMENT; MAINTENANCE POLICIES; MODEL;
D O I
10.1016/j.apm.2013.03.017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A system is subject to shocks that arrive according to a non-homogeneous pure birth process. Whenever a shock occurs, the system enters one of the two types of failure states. Type I failure (minor failure) is fixed by a minimal repair. Type II failure (catastrophic failure) is removed by a replacement. We consider an age replacement policy which replaces the system whenever its age reaches T and a spare for replacement is available. The optimal cost minimization age T* is derived under a cost structure. We demonstrate that this model includes more realistic factors and is a generalization of several previous models in the literature. (C) 2013 Elsevier Inc. All rights reserved.
引用
收藏
页码:7717 / 7725
页数:9
相关论文
共 50 条
  • [1] A note on replacement policy for a system subject to non-homogeneous pure birth shocks
    Sheu, Shey-Huei
    Chang, Chin-Chih
    Zhang, Zhe George
    Chien, Yu-Hung
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 216 (02) : 503 - 508
  • [2] Age replacement policy for a two-unit system subject to non-homogeneous pure birth shocks
    Sheu, Shey-Huei
    Sung, Chien-Kuo
    Hsu, Tsung-Shin
    Chen, Yan-Chun
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (10-11) : 7027 - 7036
  • [3] Extended optimal replacement policy for a system subject to non-homogeneous pure birth shocks
    Sheu, Shey-Huei
    Chen, Yen-Luan
    Chang, Chin-Chih
    Zhang, Zhe George
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (02) : 573 - 579
  • [4] A Block Replacement Policy for Systems Subject to Non-homogeneous Pure Birth Shocks
    Sheu, Shey-Huei
    Chen, Yen-Luan
    Chang, Chin-Chih
    Zhang, Zhe George
    [J]. IEEE TRANSACTIONS ON RELIABILITY, 2012, 61 (03) : 741 - 748
  • [5] A note on a two variable block replacement policy for a system subject to non-homogeneous pure birth shocks
    Sheu, Shey-Huei
    Chen, Yen-Luan
    Chang, Chin-Chih
    Zhang, Zhe George
    [J]. APPLIED MATHEMATICAL MODELLING, 2016, 40 (5-6) : 3703 - 3712
  • [6] Optimal age-replacement policy of a system subject to shocks with random lead-time
    Sheu, SH
    Chien, YH
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 159 (01) : 132 - 144
  • [7] Optimal Number of Repairs Before Replacement for a System Subject to Shocks of a Non-Homogeneous Pure Birth Process
    Sheu, Shey-Huei
    Chen, Yen-Luan
    Chang, Chin-Chih
    Zhang, Zhe George
    [J]. IEEE TRANSACTIONS ON RELIABILITY, 2013, 62 (01) : 73 - 81
  • [8] Optimum age replacement of a system subject to shocks with random lead time
    Sheu, SH
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1996, 27 (12) : 1417 - 1423
  • [9] Optimal number of repairs before replacement for a two-unit system subject to non-homogeneous pure birth process
    Sheu, Shey-Huei
    Liu, Tzu-Hsin
    Zhang, Zhe-George
    Chang, Tsan-Ming
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 69 : 71 - 76
  • [10] Periodic Inspection Policies of a System Subject to Shocks with Random Lead-time
    Ling, Xiaoliang
    Zhang, Yazhou
    Li, Ping
    [J]. 2019 PROGNOSTICS AND SYSTEM HEALTH MANAGEMENT CONFERENCE (PHM-QINGDAO), 2019,