Energy-oriented production planning with time-dependent energy prices

被引:5
|
作者
Johannes, Christoph [1 ]
Wichmann, Matthias G. [1 ]
Spengler, Thomas S. [1 ]
机构
[1] Tech Univ Carolo Wilhelmina Braunschweig, Inst Automot Management & Ind Prod, Muhlenpfordtstr 23, D-38106 Braunschweig, Germany
关键词
Energy-oriented production planning; lot-sizing and scheduling; time-dependent energy prices; mixed-integer programming; SYSTEM;
D O I
10.1016/j.procir.2019.01.010
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Based on a more sustainable power generation, companies are faced so far with increasing energy costs for industrial production processes. However, in the future there is a possibility to reduce energy costs by the occurrence of time-dependent energy prices in the course of a day. In order to use these time-dependent energy prices best possible and to manufacture the products at minimal decision relevant costs, production planning approaches have to consider energy costs. To date, time-dependent energy prices are considered in numerous Job Shop Scheduling Problems, but in only few simultaneous lot-sizing and scheduling approaches. Hence, an appropriate model formulation for the consideration of time-dependent energy prices in simultaneous lot-sizing and scheduling and an investigation of the cost saving potential are missing. For this purpose, the Energy-Oriented Lot-sizing and Scheduling Problem (EOLSP) is introduced in this contribution. Furthermore, the energy and total cost saving potential of the presented model formulation compared to conventional planning is discussed within an illustrative example for a pre-crushing system in a recycling company. (C) 2019 The Authors. Published by Elsevier B.V.
引用
收藏
页码:245 / 250
页数:6
相关论文
共 50 条
  • [1] Energy-oriented production planning & control
    Energieeffizienz, PPS
    1600, VDI Fachmedien GmBH & Co. KG (104): : 11 - 12
  • [2] Risk Management in Energy-oriented Production Planning and Control
    Roth S.
    Reinhart G.
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2019, 114 (12): : 823 - 827
  • [3] Energy-oriented deconstruction and recovery planning
    Schultmann, Frank
    Sunke, Nicole
    BUILDING RESEARCH AND INFORMATION, 2007, 35 (06): : 602 - 615
  • [4] Method for an energy-oriented production control
    Schultz, Cedric
    Braunreuther, Stefan
    Reinhart, Gunther
    23RD CIRP CONFERENCE ON LIFE CYCLE ENGINEERING, 2016, 48 : 248 - 253
  • [5] Energy-Oriented Production Planning in Industry: A Systematic Literature Review and Classification Scheme
    Terbrack, Hajo
    Claus, Thorsten
    Herrmann, Frank
    SUSTAINABILITY, 2021, 13 (23)
  • [6] An approach for energy-oriented production control using energy flexibility
    Schultz, Cedric
    Sellmaier, Peter
    Reinhart, Gunther
    22ND CIRP CONFERENCE ON LIFE CYCLE ENGINEERING, 2015, 29 : 197 - 202
  • [7] Energy-oriented building renovation planning considering energy performance decay
    He, Yinkun
    Zhang, Yuhao
    Fan, Yuling
    JOURNAL OF BUILDING ENGINEERING, 2024, 86
  • [8] Development and evaluation of risk treatment paths within energy-oriented production planning and control
    Stefan Roth
    Vincent Kalchschmid
    Gunther Reinhart
    Production Engineering, 2021, 15 : 413 - 430
  • [9] Cost-model for Energy-oriented Production Control
    Roesch, M.
    Berger, C.
    Braunreuther, S.
    Reinhart, G.
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 158 - 162
  • [10] Development and evaluation of risk treatment paths within energy-oriented production planning and control
    Roth, Stefan
    Kalchschmid, Vincent
    Reinhart, Gunther
    PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2021, 15 (3-4): : 413 - 430