MECHANICS ANALYSIS ON METRO STATION CONSTRUCTION BY ENLARGING LARGE-DIAMETER SHIELD TUNNEL WITH PBA METHOD

被引:0
|
作者
Wang, Fang [1 ]
He, Shaohui [1 ]
Liu, Jun [2 ]
Zou, Biao [3 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
[2] Beijing Univ Civil Engn & Architecture, Sch Civil & Transportat Engn, Beijing 100044, Peoples R China
[3] Beijing Gen Municipal Engn, Design & Res Inst, Beijing 100082, Peoples R China
关键词
metro station; enlarging shield tunnel; shield advancement; PBA method; three-dimensional model; segment;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The contradictory between the construction of metro station and shield tunnel may be high effectively and safely solved by enlarging shield tunnel with shallow buried and undercutting method. Taking Jiangtai Station of Beijing Metro line 14 as an experimental project, Pile-Beam-Arch (PBA) method is put forward to enlarge the shield tunnel with an outer diameter of 10m. This method is more conducive to structural stability and construction safety than other excavation methods. A detailed description of simulating the shield advancement and enlarging shield tunnel process is stated. The results show that the ground settlement mainly occurs in the shield advancement, and the settlement is less in the enlarging process due to the effect of perfusion piles and arches. The critical condition is excavating the first layer soil and demolishing the small blocks. The key segments work together with arches, beams, pillars and perfusion piles to form a complete mechanics system. In the process of the structure converting from the complete rings to opening rings causes the structural internal force redistribution; therefore it is important to quickly connect the arches and the key segments as a whole. The study proves that the scheme is feasible in mechanics performance and construction operation.
引用
收藏
页码:778 / +
页数:2
相关论文
共 50 条
  • [1] NUMERICAL STUDY ON THE SCHEMES FOR METRO STATION CONSTRUCTION BY ENLARGING LARGE-DIAMETER SHIELD TUNNEL
    Ding, Deyun
    Yang, Xiuren
    Lu, Weidong
    Liu, Weining
    Yan, Mei
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 666 - 671
  • [2] STUDY ON STRUCTURAL SCHEMES OF METRO STATION CONSTRUCTION BY ENLARGING LARGE-DIAMETER SHIELD TUNNEL
    Wang, Fang
    He, Shaohui
    Liu, Jun
    Cao, Ruilang
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 98 - +
  • [3] Comparative Analysis of Schemes for Metro Station Built by Enlarging Large-Diameter Shield Tunnel
    Yan, Mei
    Yang, Xiuren
    Li, Aimin
    Wang, Wenjun
    Ding, Deyun
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2731 - +
  • [4] Numerical Analysis on Deformation of Adjacent Structures due to Metro Station Construction by Enlarging Large-diameter Shield Tunnel
    Ding, Deyun
    Yang, Xiuren
    Lu, Weidong
    Liu, Weining
    Yan, Mei
    ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 261-263 : 1196 - +
  • [6] Safety analysis for metro station constructed by enlarging large diameter shield tunnel with mining method
    Li, Xiwei
    Zheng, Hao
    Wang, Quanxian
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2016, 49 (09): : 96 - 102
  • [7] Enlarging a large-diameter shield tunnel using the Pile-Beam-Arch method to create a metro station
    Liu, Jun
    Wang, Fang
    He, Shaohui
    Wang, Enzhi
    Zhou, Hong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 49 : 130 - 143
  • [8] A study of key construction technology on metro station constructed by enlarging large diameter shield tunnel
    Wang, Bo
    Li, Zhaoping
    Wang, Ting
    Zheng, Hao
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2015, 48 : 373 - 377
  • [9] Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method
    Ding, Deyun
    Yang, Xiuren
    Lu, Weidong
    Liu, Weining
    Yan, Mei
    Li, Aimin
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2711 - +
  • [10] Study of mechanical performance of metro station constructed by enlarging large diameter shield tunnel
    Ding De-yun
    Lu Wei-dong
    Yang Xiu-ren
    Liu Wei-ning
    Yan Mei
    ROCK AND SOIL MECHANICS, 2010, 31 : 281 - 287