An Approximation Scheme for Heterogeneous Parallel Task Scheduling in a Two-Stage Hybrid Flow Shop

被引:0
|
作者
Sun, Jinghao [1 ]
Meng, Yakun [1 ]
机构
[1] Northeastern Univ, Sch Informat Sci & Engn, Shenyang 110004, Peoples R China
关键词
hybrid flow shop; scheduling; heterogeneous parallel tasks; approximation scheme; worst-case analysis; MULTIPROCESSOR TASKS; ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Motivated by applications in cyber-physical systems (CPS), this paper introduces a two-stage hybrid flow shop with heterogeneous parallel tasks for minimizing makespan. There is only one processor for the first stage and m identical parallel processors for the second stage. Each task consists of several operations where the first operation executed at the first stage and afterwards the other operations with different processing time which can be executed concurrently at the second stage. The problem is proved to be NP-hard in the strong sense even when m = 2 and each task consists of only one operation at the second stage. To deal with the intractable problem, we first equivalently cast it to a two-stage multiprocessor schedule problem with clustered tasks. Then we show that the search for an optimal solution of the latter problem may be restricted to the schedules that execute the first-stage operations of each task cluster in a chain. Finally, we demonstrate the existence of an approximation scheme for this problem with a worst-case ratio bound of 1 + epsilon and a running time polynomial in 1/epsilon.
引用
收藏
页码:1291 / 1308
页数:18
相关论文
共 50 条
  • [1] An approximation scheme for heterogeneous parallel task scheduling in a two-stage hybrid flow shop
    School of Information Science and Engineering, Northeastern University, Shengyang
    110004, China
    J. Inf. Sci. Eng., 4 (1291-1308):
  • [2] An approximation algorithm for proportionate scheduling in the two-stage hybrid flow shop
    Dong, Jianming
    Jiang, Yiwei
    Zhang, An
    Hu, Jueliang
    Luo, Hui
    INFORMATION PROCESSING LETTERS, 2015, 115 (04) : 475 - 480
  • [3] Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
    Gupta, JND
    Hariri, AMA
    Potts, CN
    ANNALS OF OPERATIONS RESEARCH, 1997, 69 (0) : 171 - 191
  • [4] Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
    J.N.D. Gupta
    A.M.A. Hariri
    C.N. Potts
    Annals of Operations Research, 1997, 69 : 171 - 191
  • [5] Distributed two-stage hybrid flow shop scheduling
    Zhang Q.
    Sun Z.
    Lei D.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2020, 48 (04): : 127 - 132
  • [6] Optimal scheduling of a two-stage hybrid flow shop
    Haouari, Mohamed
    Hidri, Lotfi
    Gharbi, Anis
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2006, 64 (01) : 107 - 124
  • [7] Optimal Scheduling of a Two-stage Hybrid Flow Shop
    Mohamed Haouari
    Lotfi Hidri
    Anis Gharbi
    Mathematical Methods of Operations Research, 2006, 64 : 107 - 124
  • [8] Approximation algorithms for two-stage flexible flow shop scheduling
    Zhang, Minghui
    Lan, Yan
    Han, Xin
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2020, 39 (01) : 1 - 14
  • [9] Approximation algorithms for two-stage flexible flow shop scheduling
    Minghui Zhang
    Yan Lan
    Xin Han
    Journal of Combinatorial Optimization, 2020, 39 : 1 - 14
  • [10] Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop
    Oguz, C
    Ercan, MF
    Cheng, TCE
    Fung, YF
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 390 - 403