Experience from 10 years of full-scale operation with enhanced biological phosphorus removal at Oresundsverket

被引:12
|
作者
Tykesson, E
Jönsson, LE
Jansen, JL
机构
[1] Lund Univ, SE-22100 Lund, Sweden
[2] Helsingborgs Water & Sewage Works, SE-25227 Helsingborg, Sweden
关键词
enhanced biological phosphorus removal; phosphorus removal; wastewater treatment; hydrolysis;
D O I
10.2166/wst.2005.0451
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Ten years of full-scale experience with enhanced biological phosphorus removal (EBPR) has been evaluated. During the start-up period lack of carbon source was the main operational problem and a higher level of volatile fatty acids was secured by introducing a primary sludge hydrolysis. Acidic thermal sludge hydrolysis was used as the sludge treatment method at the plant during about three years. One effluent stream, rich in carbon and precipitant, was brought back to the process leading to an improvement of the phosphorus removal both by an improved biological process and chemical precipitation. A quite stable process of EBPR was developed with low levels of effluent phosphorus concentration. Stringent effluent discharge limits during short evaluation periods necessitated a continued work for improvement of the shortterm stability. During periods with lack of carbon, such as industrial holiday or rainy periods, both simultaneous precipitation and reduced aeration have been successfully tested as strategies for securing low levels of effluent phosphorus.
引用
收藏
页码:151 / 159
页数:9
相关论文
共 50 条
  • [1] OPERATION OF FULL-SCALE BIOLOGICAL PHOSPHORUS REMOVAL PLANT
    LEVIN, GV
    TOPOL, GJ
    TARNAY, AG
    JOURNAL WATER POLLUTION CONTROL FEDERATION, 1975, 47 (03): : 577 - 590
  • [2] Full-scale experience with enhanced biological phosphorus removal (EBPR) in cold climates
    Ydstebo, L
    Bilstad, T
    Kommedal, R
    JOURNAL OF ENVIRONMENTAL SCIENCE AND HEALTH PART A-TOXIC/HAZARDOUS SUBSTANCES & ENVIRONMENTAL ENGINEERING, 2000, 35 (08): : 1493 - 1502
  • [3] Full-scale experience with enhanced biological phosphorus removal (EBPR) in cold climates
    Ydstebo, L.
    Bilstad, T.
    Kommedal, R.
    1600, Marcel Dekker Inc. (35):
  • [4] Enhanced biological phosphorus removal in a semi full-scale SBBR
    Arnz, P
    Arnold, E
    Wilderer, PA
    WATER SCIENCE AND TECHNOLOGY, 2001, 43 (03) : 167 - 174
  • [5] Carbon and phosphorus transformations in a full-scale enhanced biological phosphorus removal process
    Lie, E
    Christensson, M
    Jonsson, K
    Ostgaard, K
    Johansson, P
    Welander, T
    WATER RESEARCH, 1997, 31 (11) : 2693 - 2698
  • [6] Metabolic modelling of full-scale enhanced biological phosphorus removal sludge
    Lanham, Ana B.
    Oehmen, Adrian
    Saunders, Aaron M.
    Carvalho, Gilda
    Nielsen, Per H.
    Reis, Maria A. M.
    WATER RESEARCH, 2014, 66 : 283 - 295
  • [7] Applicability of experience from laboratory reactors with biological phosphorus removal in full-scale plants
    Tykesson, E.
    Blackall, L. L.
    Kong, Y.
    Nielsen, P. H.
    Jansen, J. la Cour
    WATER SCIENCE AND TECHNOLOGY, 2006, 54 (01) : 267 - 275
  • [8] A Full-Scale Study On Phosphorus Removal From Biological A/O Process Enhanced By Zeolite
    Cheng, Guan-Wen
    Xu, Shan
    Wang, Rui-Ping
    Wu, Zhi-Chao
    Zhang, Fei-Juan
    Huang, Xiang-Feng
    2009 3RD INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING, VOLS 1-11, 2009, : 4912 - +
  • [9] Two years of full-scale storm operation experience
    Bixio, D
    Carrette, R
    Thoeye, C
    WATER SCIENCE AND TECHNOLOGY, 2002, 46 (6-7) : 167 - 172
  • [10] A metagenome of a full-scale microbial community carrying out enhanced biological phosphorus removal
    Albertsen, Mads
    Hansen, Lea Benedicte Skov
    Saunders, Aaron Marc
    Nielsen, Per Halkjaer
    Nielsen, Kare Lehmann
    ISME JOURNAL, 2012, 6 (06): : 1094 - 1106