Supply chain scheduling: makespan reduction potential

被引:4
|
作者
Ullrich, Christian A. [1 ]
机构
[1] Univ Bielefeld, Dept Business Adm & Econ, Bielefeld, Germany
关键词
supply chain scheduling; makespan; hybrid flow shop; numerical study; FAST-FASHION; VERTICAL INTEGRATION; CLOTHING INDUSTRY; INFORMATION; MANAGEMENT; CLASSIFICATION; COORDINATION; RETAILER;
D O I
10.1080/13675567.2012.742045
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Supply chain scheduling addresses the coordination of machine and delivery scheduling of two or more supply chain stages. The aim is to improve supply chain performance measured in total logistics costs or the supply chain makespan, for example. However, the potential for improvement has never before been quantified, so this relatively new and ambitious field of study has not yet been properly justified. If performance improvements would barely compensate for the cost of coordination, supply chain scheduling would be expendable. This paper deals with a supply chain consisting of four stages. Focusing on the supply chain makespan, eight scheduling scenarios are compared by means of a numerical study. The simplest scenario is characterised by separate scheduling of all stages. The most promising scenario is a joint scheduling approach that treats the supply chain as a flow shop. In the other six scenarios, different subsets of stages coordinate their schedules. Joint supply chain scheduling of all stages significantly outperforms the other seven scenarios. This result holds for the case with a single machine as well as for two identical parallel machines at each stage. Owing to the complexity of some of the scheduling problems to be tackled in the experiments, the numerical study is based on small-size instances with only five jobs so that it can be solved using a commercial optimisation software. Hence, a simpler two-stage supply chain with a single machine at each stage is investigated to obtain results for large-size instances. Since the shortest processing time priority applied at the first stage leads to permutation schedules which on average result in near-optimum makespans, a joint supply chain coordination approach based on Johnson's algorithm turns out to be unreasonable especially when considering the cost of coordination.
引用
收藏
页码:323 / 336
页数:14
相关论文
共 50 条
  • [1] Preemptive scheduling in a two-stage supply chain to minimize the makespan
    Pei, Jun
    Fan, Wenjuan
    Pardalos, Panos M.
    Liu, Xinbao
    Goldengorin, Boris
    Yang, Shanlin
    OPTIMIZATION METHODS & SOFTWARE, 2015, 30 (04): : 727 - 747
  • [2] Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan
    Pei, Jun
    Pardalos, Panos M.
    Liu, Xinbao
    Fan, Wenjuan
    Yang, Shanlin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (01) : 13 - 25
  • [3] Production scheduling with supply and delivery considerations to minimize the makespan
    Wang, Xiuli
    Cheng, T. C. E.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 194 (03) : 743 - 752
  • [4] Supply Chain Scheduling
    Sriskandarajah, Chelliah
    INFORMS JOURNAL ON APPLIED ANALYTICS, 2023, 53 (02): : 169 - 172
  • [5] OKP Supply Chain Scheduling
    Zhang, Jian
    Tu, Yiliu
    ELEVENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, 2012, : 707 - 713
  • [6] Dynamic supply chain scheduling
    Ivanov, D.
    Sokolov, B.
    JOURNAL OF SCHEDULING, 2012, 15 (02) : 201 - 216
  • [7] Scheduling in supply chain environment
    Chauhan, Satyaveer S.
    Gordon, Valery
    Proth, Jean-Marie
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (03) : 961 - 970
  • [8] Coordinated supply chain scheduling
    Sawik, Tadeusz
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) : 437 - 451
  • [9] Dynamic supply chain scheduling
    D. Ivanov
    B. Sokolov
    Journal of Scheduling, 2012, 15 : 201 - 216
  • [10] Cork stoppers supply chain: potential scenarios for environmental impact reduction
    Demertzi, Martha
    Silva, Rui Pedro
    Neto, Belmira
    Dias, Ana Claudia
    Arroja, Luis
    JOURNAL OF CLEANER PRODUCTION, 2016, 112 : 1985 - 1994