共 50 条
- [1] Field performance assessment of VAV control systems to determine the longevity of recommissioning [J]. ASHRAE Transactions 2005, Vol 111, Pt 1, 2005, 111 : 37 - 52
- [3] ENERGY AND VENTILATION PERFORMANCE ANALYSIS FOR CO2-BASED DEMAND-CONTROLLED VENTILATION IN MULTIPLE ZONE VAV SYSTEMS WITH MULTIPLE RECIRCULATION PATHS [J]. 2020 ASHRAE BUILDING PERFORMANCE ANALYSIS CONFERENCE AND SIMBUILD, 2020, : 308 - 316
- [4] Controlling minimum ventilation volume in VAV systems [J]. ASHRAE JOURNAL-AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR-CONDITIONING ENGINEERS, 1998, 40 (05): : 45 - +
- [7] CONTROL STRATEGIES FOR VAV SYSTEMS [J]. HEATING-PIPING-AIR CONDITIONING, 1984, 56 (09): : 147 - 148
- [8] VAV system ventilation [J]. ASHRAE JOURNAL-AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR-CONDITIONING ENGINEERS, 1998, 40 (08): : 24 - 24
- [9] Stability of Temperature Control in VAV Systems [J]. ASHRAE TRANSACTIONS 2009, VOL 115, PT 1, 2009, 115 : 613 - +