Progression of performance assessment modeling for the Yucca Mountain disposal system for spent nuclear fuel and high-level radioactive waste

被引:12
|
作者
Rechard, Rob P. [1 ]
Wilson, Michael L. [1 ]
Sevougian, S. David [1 ]
机构
[1] Sandia Natl Labs, Albuquerque, NM 87185 USA
关键词
Performance assessment; High-level radioactive waste; Spent nuclear fuel; Radioactive waste disposal; Probabilistic risk assessment; Yucca Mountain; ISOLATION PILOT-PLANT; SATURATED FRACTURED TUFF; SENSITIVITY-ANALYSIS; THERMOHYDROLOGIC CONDITIONS; PROBABILITY-DISTRIBUTIONS; UNCERTAINTY; REPOSITORY; NEVADA; ASSIGNMENT; PARAMETERS;
D O I
10.1016/j.ress.2013.06.026
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper summarizes the evolution of consequence modeling for a repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain in southern Nevada. The discussion includes four early performance assessments (PAs) conducted between 1982 and 1995 to support selection and to evaluate feasibility and three major PAs conducted between 1998 and 2008 to evaluate viability, recommend the site, and assess compliance. Modeling efforts in 1982 estimated dose to individuals 18 km from the site caused by volcanic eruption through the repository. Modeling in 1984 estimated releases via the groundwater pathway because of container corrosion. In combination, this early analysis supported the first environmental assessment Analysts in 1991 evaluated cumulative release, as specified in the 1985 US radiation protection standards, via the groundwater pathway over 10(4) yr at a 5-km boundary by modeling waste degradation and flow/transport in the saturated and unsaturated zones. By 1992, however, the US Congress mandated a change to a dose measure. Thus, the 1993 and 1995 performance assessments improved modeling of waste container degradation to provide better estimates of radionuclide release rates out to 10(6) yr. The 1998 viability assessment was a major step in modeling complexity. Dose at a 20-km boundary from the repository was evaluated through 10(6) yr for undisturbed conditions using more elaborate modeling of flow and the addition of modules for modeling infiltration, drift seepage, the chemical environment, and biosphere transport. The 2000 assessment for the site recommendation refined the analysis. Seepage modeling was greatly improved and waste form degradation modeling included more chemical dependence. The 2008 compliance assessment for the license application incorporated the influence of the seismicity on waste package performance to evaluate dose at an similar to 18-km boundary. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:96 / 123