In this paper, we consider heuristics for master planning in semiconductor manufacturing. While lead times are typically assumed as fixed in production planning, we use iterative simulation to take load-dependent lead times into account. An AutoSched AP simulation model of a semiconductor supply chain is used for implementing the scheme. Simulation results show that the iterative scheme converges fast and leads to less variable, more profitable production plans compared to planes obtained by the fixed lead time approach.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] An integrated production planning model with load-dependent lead-times and safety stocks
    Orcun, Seza
    Uzsoy, Reha
    Kempf, Karl G.
    COMPUTERS & CHEMICAL ENGINEERING, 2009, 33 (12) : 2159 - 2163
  • [2] Analytics for labor planning in systems with load-dependent service times
    Smirnov, Dmitry
    Huchzermeier, Arnd
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 287 (02) : 668 - 681
  • [3] Production planning with load dependent lead times
    Pahl J.
    Voß S.
    Woodruff D.L.
    4OR, 2005, 3 (4) : 257 - 302
  • [4] Integrating order acceptance decisions with flexible due dates in a production planning model with load-dependent lead times
    Brahimi, Nadjib
    Aouam, Tarik
    Aghezzaf, El-Houssaine
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (12) : 3810 - 3822
  • [5] Safety stock placement with market selection under load-dependent lead times
    Ghadimi, Foad
    Aouam, Tarik
    Uzsoy, Reha
    IISE TRANSACTIONS, 2023, 55 (03) : 314 - 328
  • [6] Capacity restrictions and supply chain performance: Modelling and analysing load-dependent lead times
    Cannella, Salvatore
    Dominguez, Roberto
    Ponte, Borja
    Framinan, Jose M.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 204 : 264 - 277
  • [7] Production planning with load dependent lead times: an update of research
    Pahl, Julia
    Voss, Stefan
    Woodruff, David L.
    ANNALS OF OPERATIONS RESEARCH, 2007, 153 (01) : 297 - 345
  • [8] Production planning with load dependent lead times: an update of research
    Julia Pahl
    Stefan Voß
    David L. Woodruff
    Annals of Operations Research, 2007, 153 : 297 - 345
  • [9] Flows over time with load-dependent transit times
    Köhler, E
    Skutella, M
    PROCEEDINGS OF THE THIRTEENTH ANNUAL ACM-SIAM SYMPOSIUM ON DISCRETE ALGORITHMS, 2002, : 174 - 183
  • [10] Flows over time with load-dependent transit times
    Köhler, E
    Skutella, M
    SIAM JOURNAL ON OPTIMIZATION, 2005, 15 (04) : 1185 - 1202