Testing Analysis of Foundation Settlement and Deformation on Overall Structure of Piled Raft

被引:0
|
作者
Li, Dongxia [1 ]
Liu, Xiubo [2 ]
Su, Qian [3 ]
机构
[1] Jilin Railway Vocat & Technol Coll, Jilin 132001, Jilin, Peoples R China
[2] China Acad Railway Sci, Beijing 100081, Peoples R China
[3] Southwest Jiaotong Univ, Chengdu 610031, Peoples R China
关键词
overall structure of piled raft; foundation settlement deformation; testing;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Settlement control is the keystone of high-speed railway foundation. This paper is based on the long-term site observation to settlement of typical sections on the overall structure of piled raft in actual application at Xiuzhou Section in Jing-Hu High-speed Railway. The paper analyzes the land settlement, layered settlement, lateral displacement, excessive pore pressure, horizontal displacement and other deformation and characteristics of foundation of piled raft structure. In addition, the deformation characteristics of the natural foundation and piled raft foundation are compared to understand the working performance and application effects of piled raft structure ([1]). The results show that the piled raft changes the deformation features of natural foundation, so that the foundation settlement mainly occurs in the subjacent bed, and the total settling amount reduces greatly. Piled raft can greatly reduce the lateral deformation of foundation soil and additional settlement resulting from it. The piled raft structure improves not only the deformation modulus and synthetic stiffness of the reinforced area, but also the capability of anti-deformation under external load, as a result, its effect of controlling roadbed settlement is obvious.
引用
下载
收藏
页码:257 / +
页数:2
相关论文
共 50 条
  • [1] Numerical Analysis of Settlement of a Piled Raft Foundation on Coastal Soil
    Shah, Syed Raghib Abbas
    Kumar, Aneel
    Zardari, Muhammad Auchar
    Ali, Tauha Hussain
    Bhanbhro, Riaz
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2023, 9 (02): : 319 - 333
  • [2] Settlement Analysis of Piled-Raft Foundation Using Numerical Method
    Liu, Wen-Tsung
    Lin, Chun-Yi
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1276 - 1281
  • [3] Prediction of piled raft foundation settlement - A case study
    Long, Phung Duc (phung.long@gmail.com), 1600, Southeast Asian Geotechnical Society (47):
  • [4] Prediction of Piled Raft Foundation Settlement - A Case Study
    Phung Duc Long
    GEOTECHNICAL ENGINEERING, 2016, 47 (01): : 1 - 6
  • [5] Observation and back analysis of settlement of piled-raft foundation in soft soil
    Xiao Jun-hua
    Zhao Xi-hong
    ROCK AND SOIL MECHANICS, 2016, 37 (06) : 1680 - 1688
  • [6] Experimental study on deformation behavior of piled raft foundation
    Zhang, Wu
    Chi, Lingquan
    Gao, Wensheng
    Liu, Jinli
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2010, 31 (07): : 94 - 102
  • [7] Settlement and load sharing behavior of piled raft foundation: a review
    Malviya, Dinesh Kumar
    Ansari, Adnan
    Samanta, Manojit
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2023, 8 (11)
  • [8] Settlement and load sharing behavior of piled raft foundation: a review
    Dinesh Kumar Malviya
    Adnan Ansari
    Manojit Samanta
    Innovative Infrastructure Solutions, 2023, 8
  • [9] On pile and piled raft footing settlement analysis
    Aleksandrovich, V. F.
    Barvashov, V. A.
    Bobyr, G. A.
    Fedorovsky, V. G.
    Kurillo, S. V.
    Skorokhodov, A. G.
    Proceedings of the 16th International Conference on Soil Mechanics and Geotechnical Engineering, Vols 1-5: GEOTECHNOLOGY IN HARMONY WITH THE GLOBAL ENVIRONMENT, 2005, : 1939 - 1942
  • [10] Settlement calculation for long-short composite piled raft foundation
    Ming-hua Zhao
    Ling Zhang
    Ming-hui Yang
    Journal of Central South University of Technology, 2006, 13 : 749 - 754