This land is your land, it's right by my land - Case 1038 (May-August 2005)

被引:0
|
作者
Lawson, WD [1 ]
机构
[1] Texas Tech Univ, Natl Inst Engn Eth, Lubbock, TX USA
关键词
D O I
10.1061/(ASCE)1052-3928(2006)132:2(99)
中图分类号
G40 [教育学];
学科分类号
040101 ; 120403 ;
摘要
A case study of Daulton Squyres, a licensed engineer and project manager for ClearWater Developers, is presented. Daulton faces a challenge to get a high profile, 90-lot subdivision in Murray Township platted, designed and constructed on an accelerated time schedule, thereby retains Elias and Shellie's joint venture to design and supervise construction of the subdivision in Murray Township. The fact that Elias and Shellie working on the subdivision in Murray Township and also serves as engineer for Walbert Township, resulted in a conflict. To solve the matter, Daulton was advised to contact Murray and Walbert Townships and then convene a meeting with Elias and Shelle.
引用
收藏
页码:99 / 102
页数:4
相关论文
共 50 条