Network Models for Solving the Problem of Multicriterial Adaptive Optimization of Investment Projects Control with Several Acceptable Technologies

被引:3
|
作者
Shorikov, A. F. [1 ,2 ]
Butsenko, E. V. [3 ]
机构
[1] Ural Fed Univ, Ekaterinburg, Russia
[2] RAS, UB, Inst Math & Mech, Ekaterinburg, Russia
[3] Ural State Univ Econ, Ekaterinburg, Russia
关键词
D O I
10.1063/1.5007385
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
This paper discusses the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. On the basis of network modeling proposed a new economic and mathematical model and a method for solving the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. Network economic and mathematical modeling allows you to determine the optimal time and calendar schedule for the implementation of the investment project and serves as an instrument to increase the economic potential and competitiveness of the enterprise. On a meaningful practical example, the processes of forming network models are shown, including the definition of the sequence of actions of a particular investment projecting process, the network-based work schedules are constructed. The calculation of the parameters of network models is carried out. Optimal (critical) paths have been formed and the optimal time for implementing the chosen technologies of the investment project has been calculated. It also shows the selection of the optimal technology from a set of possible technologies for project implementation, taking into account the time and cost of the work. The proposed model and method for solving the problem of managing investment projects can serve as a basis for the development, creation and application of appropriate computer information systems to support the adoption of managerial decisions by business people.
引用
收藏
页数:8
相关论文
共 6 条
  • [1] Optimization model of railroad network design and investment including multiple projects in several five-year plans
    Yan, He-Xiang
    Lin, Bo-Liang
    Liang, Dong
    Tiedao Xuebao/Journal of the China Railway Society, 2007, 29 (03): : 19 - 24
  • [2] Immune optimization algorithm for solving joint call admission control problem in next-generation wireless network
    Zhu, Si-feng
    Liu, Fang
    Qi, Yu-tao
    Chai, Zheng-yi
    Wu, Jian-she
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2012, 25 (07) : 1395 - 1402
  • [3] Design and Application of an Adaptive Fuzzy Control Strategy to Zeroing Neural Network for Solving Time-Variant QP Problem
    Jia, Lei
    Xiao, Lin
    Dai, Jianhua
    Qi, Zhaohui
    Zhang, Zhijun
    Zhang, Yongsheng
    IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2021, 29 (06) : 1544 - 1555
  • [4] A Simulation-Based Optimization Method for Solving the Integrated Supply Chain Network Design and Inventory Control Problem under Uncertainty
    Ye, Wenhe
    You, Fengqi
    PRES15: PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2015, 45 : 499 - 504
  • [5] Noise-suppressing zeroing neural network for online solving time-varying nonlinear optimization problem: a control-based approach
    Sun, Zhongbo
    Shi, Tian
    Wei, Lin
    Sun, Yingyi
    Liu, Keping
    Jin, Long
    NEURAL COMPUTING & APPLICATIONS, 2020, 32 (15): : 11505 - 11520
  • [6] Noise-suppressing zeroing neural network for online solving time-varying nonlinear optimization problem: a control-based approach
    Zhongbo Sun
    Tian Shi
    Lin Wei
    Yingyi Sun
    Keping Liu
    Long Jin
    Neural Computing and Applications, 2020, 32 : 11505 - 11520