Long-term generation scheduling of Xiluodu and Xiangjiaba cascade hydro plants considering monthly streamflow forecasting error

被引:44
|
作者
Xie, Mengfei
Zhou, Jianzhong [1 ]
Li, Chunlong
Zhu, Shuang
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China
关键词
Long-term hydro generation scheduling; Monthly streamflow forecasting error; Monte Carlo simulation; Improved parallel progressive optimality algorithm; Forecasting dispatching chart; OPTIMAL OPERATION; OPTIMIZATION; STATIONS; RIVER; PREDICTION; 3-GORGE; SYSTEM; RULES; MODEL;
D O I
10.1016/j.enconman.2015.08.009
中图分类号
O414.1 [热力学];
学科分类号
摘要
Reliable streamflow forecasts are very significant for reservoir operation and hydropower generation. But for monthly streamflow forecasting, the forecasting result is unreliable and it is hard to be utilized, although it has a certain reference value for long-term hydro generation scheduling. Current researches mainly focus on deterministic scheduling, and few of them consider the uncertainties. So this paper considers the forecasting error which exists in monthly streamflow forecasting and proposes a new long-term hydro generation scheduling method called forecasting dispatching chart for Xiluodu and Xiangjiaba cascade hydro plants. First, in order to consider the uncertainties of inflow, Monte Carlo simulation is employed to generate streamflow data according to the forecasting value and error distribution curves. Then the large amount of data obtained by Monte Carlo simulation is used as inputs for long-term hydro generation scheduling model. Because of the large amount of streamflow data the computation speed of conventional algorithm cannot meet the demand. So an improved parallel progressive optimality algorithm is proposed to solve the long-term hydro generation scheduling problem and a series of solutions are obtained. These solutions constitute an interval set, unlike the unique solution in the traditional deterministic long-term hydro generation scheduling. At last, the confidence intervals of the solutions are calculated and forecasting dispatching chart is proposed as a new-method for long-term hydro generation scheduling. A set of rules are proposed corresponding to forecasting dispatching chart. The chart is tested for practical operations and achieves good performance. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:368 / 376
页数:9
相关论文
共 30 条
  • [1] Long-term monthly streamflow forecasting in humid and semiarid regions
    Fouchal, Amel
    Souag-Gamane, Doudja
    [J]. ACTA GEOPHYSICA, 2019, 67 (04) : 1223 - 1240
  • [2] Long-term monthly streamflow forecasting in humid and semiarid regions
    Amel Fouchal
    Doudja Souag-Gamane
    [J]. Acta Geophysica, 2019, 67 : 1223 - 1240
  • [3] Long-Term Generation Scheduling for Cascade Hydropower Plants Considering Price Correlation between Multiple Markets
    Luo, Bin
    Miao, Shumin
    Cheng, Chuntian
    Lei, Yi
    Chen, Gang
    Gao, Lang
    [J]. ENERGIES, 2019, 12 (12)
  • [4] Short-term hydro generation scheduling of Xiluodu and Xiangjiaba cascade hydropower stations using improved binary-real coded bee colony optimization algorithm
    Lu, Peng
    Zhou, Jianzhong
    Wang, Chao
    Qiao, Qi
    Mo, Li
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2015, 91 : 19 - 31
  • [5] Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints
    Xie, Mengfei
    Zhou, Jianzhong
    Li, Chunlong
    Lu, Peng
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2016, 142 (04)
  • [6] Long-Term Scheduling of Cascade Reservoirs Considering Inflow Forecasting Uncertainty Based on a Disaggregation Model
    Xiaoling Ding
    Xiaocong Mo
    Jianzhong Zhou
    Sheng Bi
    Benjun Jia
    Xiang Liao
    [J]. Water Resources Management, 2021, 35 : 645 - 660
  • [7] Long-Term Scheduling of Cascade Reservoirs Considering Inflow Forecasting Uncertainty Based on a Disaggregation Model
    Ding, Xiaoling
    Mo, Xiaocong
    Zhou, Jianzhong
    Bi, Sheng
    Jia, Benjun
    Liao, Xiang
    [J]. WATER RESOURCES MANAGEMENT, 2021, 35 (02) : 645 - 660
  • [8] A novel ensemble model for long-term forecasting of wind and hydro power generation
    Malhan, Priyanka
    Mittal, Monika
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2022, 251
  • [9] Short-Term Hydro Generation Scheduling Of Cascade Plants Operating On Litani River Project - Lebanon
    Bou-Fakhreddine, Bassam
    Abou-Chakra, Sara
    Mougharbel, Imad
    Faye, Alain
    Pollet, Yann
    [J]. 2016 3RD INTERNATIONAL CONFERENCE ON RENEWABLE ENERGIES FOR DEVELOPING COUNTRIES (REDEC), 2016,
  • [10] Long-term streamflow forecasting for the Cascade Reservoir System of Han River using SWAT with CFS output
    Liu, Tian
    Chen, Yuanfang
    Li, Binquan
    Hu, Yiming
    Qiu, Hui
    Liang, Zhongmin
    [J]. HYDROLOGY RESEARCH, 2019, 50 (02): : 655 - 671