Construction Resource Allocation and Leveling Using a Threshold Accepting-Based Hyperheuristic Algorithm

被引:36
|
作者
Koulinas, Georgios K. [1 ]
Anagnostopoulos, Konstantinos P. [1 ]
机构
[1] Democritus Univ Thrace, Sch Engn, Dept Prod & Management Engn, GR-67100 Xanthi, Greece
关键词
Resource allocation; Resource leveling; Optimization; Construction management; Scheduling; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; PROJECTS;
D O I
10.1061/(ASCE)CO.1943-7862.0000492
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study we propose a threshold accepting based hyperheuristic for solving in a single run both the resource-constrained project scheduling problem or resource allocation, and the resource leveling problem. Having their roots in the field of artificial intelligence, hyperheuristics operate in the "low-level" heuristics domain rather than in the solutions domain. The hyperheuristic has been implemented within a commercial project management software package. Low-level heuristics operate on the solution domain defined by the priority values that the software uses for resource allocation. A case example from the literature and computational experiments on randomly generated projects demonstrate that the hyperheuristic achieves good performance in a timely manner, improving the results provided by the software. DOI: 10.1061/(ASCE)CO.1943-7862.0000492. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:854 / 863
页数:10
相关论文
共 50 条
  • [1] A study of jamming resource allocation based on a hyperheuristic framework
    Hao, Zelong
    Wang, Xing
    Chen, You
    AIP ADVANCES, 2024, 14 (05)
  • [2] Ant colony algorithm for construction resource leveling
    Kuang, Ya-Ping
    Xiong, Ying
    Zhang, Meng-Fang
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2008, 42 (07): : 1194 - 1198
  • [3] Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling
    Jun, Dho Heon
    El-Rayes, Khaled
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (12): : 1080 - 1088
  • [4] Construction of uniform designs via an adjusted threshold accepting algorithm
    Fang, Kai-Tai
    Ke, Xiao
    Elsawah, A. M.
    JOURNAL OF COMPLEXITY, 2017, 43 : 28 - 37
  • [5] Construction resource leveling using neural networks
    Savin, D
    Alkass, S
    Fazio, P
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1996, 23 (04) : 917 - 925
  • [6] A threshold accepting algorithm for the uncapacitated single allocation hub location problem
    Ting, Ching-Jung
    Wang, Hung-Jie
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2014, 37 (03) : 300 - 312
  • [7] Vertical fragmentation and allocation in distributed databases with site capacity restrictions using the threshold accepting algorithm
    Pérez, J
    Pazos, R
    Frausto, J
    Romero, D
    Cruz, L
    MICAI 2000: ADVANCES IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2000, 1793 : 75 - 81
  • [8] Optimization of resource allocation and leveling using genetic algorithms
    Hegazy, T
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03): : 167 - 175
  • [9] Optimization of resource allocation and leveling using genetic algorithms
    Hegazy, Tarek
    Journal of Construction Engineering and Management, 125 (03): : 167 - 175
  • [10] Optimization Algorithm for Resource Leveling of Construction Projects with Multiple Resources Based on Subset Simulation
    Wang J.
    Liu K.
    Zhang X.
    Chen T.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2021, 48 (07): : 168 - 176