In field overlay uncertainty contributors - a back end study

被引:2
|
作者
Adel, Mike [1 ]
Frommer, Aviv [1 ]
Kassel, Elyakim [1 ]
Izikson, Pavel [1 ]
Leray, Philippe [2 ]
Schulz, Bernd [3 ]
Seltmann, Rolf [3 ]
Busch, Jens [3 ]
机构
[1] KLA Tencor Corp Israel, IL-23100 Migdal Ha Emek, Israel
[2] IMEC, B-3001 Leuven, Belgium
[3] AMD Saxony Ltd Liabil Co & Co KG, Dresden, Germany
关键词
overlay; metrology; residuals; process control;
D O I
10.1117/12.656467
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
In this publication, the contributors to in-field overlay metrology uncertainty have been parsed and quantified on a back end process and compared with results from a previous front end study(1). Particular focus is placed on the unmodeled systematics, i.e. the components which contribute to residuals in a linear model after removal of random errors. These are the contributors which are often the most challenging to quantify and are Suspected to be significant in the model residuals. The results show that in both back and front end processes, the Unmodeled systematics are the dominant residual contributor, accounting for 60 to 70% of the variance, even when subsequent exposures are on the same scanner. A higher order overlay model analysis demonstrates that this element of the residuals can be further dissected into correctible and non-correctible high order systematics. A preliminary sampling analysis demonstrates a major opportunity to improve the accuracy of lot dispositioning parameters by transitioning to denser sample plans compared with standard practices. Field stability is defined as a metric to quantify the field to field variability of the intrafield correctibles.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] In field overlay uncertainty contributors
    Frommer, A
    Kassel, E
    Izikson, P
    Adel, M
    Leray, P
    Schulz, B
    Metrology, Inspection, and Process Control for Microlithography XIX, Pts 1-3, 2005, 5752 : 51 - 58
  • [2] Impact of overlay routing on end-to-end delay
    Zhang, Hui
    Tang, Li
    Li, Jun
    ICCCN 2006: 15TH INTERNATIONAL CONFERENCE ON COMPUTER COMMUNICATIONS AND NETWORKS, PROCEEDINGS, 2006, : 435 - +
  • [3] Evaluation of measurement uncertainty contributors for vision CMMs
    Van Gestel, N.
    Welkenhuyzen, F.
    Bleys, P.
    Kruth, J. -P.
    OPTICAL MEASUREMENT TECHNIQUES FOR STRUCTURES AND SYSTEMS, 2009, : 359 - 367
  • [4] Bitumen stabilized materials as pavement overlay: Laboratory and field study
    Dias, Claudio Renato Castro
    Nunez, Washington Peres
    Brito, Antonio Teixeira
    Johnston, Marlova Grazziotin
    Ceratti, Jorge Augusto Pereira
    Wagner, Leonardo Lunkes
    Fedrigo, William
    CONSTRUCTION AND BUILDING MATERIALS, 2023, 369
  • [5] Reasoning under Uncertainty for Overlay Fault Diagnosis
    Tang, Yongning
    Al-Shaer, Ehab
    Joshi, Kaustubh
    IEEE TRANSACTIONS ON NETWORK AND SERVICE MANAGEMENT, 2012, 9 (01): : 34 - 47
  • [6] Research on the Temperature Stress Field of Interface End between Asphalt Concrete Overlay and Concrete Pavement
    Zhang, Yuwei
    Yang, Qingguo
    Tu, Zhizhong
    MATERIALS SCIENCE AND ENGINEERING APPLICATIONS, PTS 1-3, 2011, 160-162 : 1704 - 1711
  • [7] END THE UNCERTAINTY
    CALDWELL, EF
    CEREAL FOODS WORLD, 1988, 33 (11) : 906 - 906
  • [8] An end to uncertainty
    Buchanan, M
    NEW SCIENTIST, 1999, 161 (2176) : 25 - 28
  • [9] An end to uncertainty
    Poppy, Guy
    NATURE, 2020, 588 (7836) : S10 - S10
  • [10] Electromagnetic Field Test Structure Chip for Back End of the Line Metrology
    You, Lin
    Ahn, Jung-Joon
    Hitz, Emily
    Michelson, Jonathon
    Obeng, Yaw
    Kopanski, Joseph
    PROCEEDINGS OF THE 2015 IEEE INTERNATIONAL CONFERENCE ON MICROELECTRONIC TEST STRUCTURES (ICMTS 2015), 2015, : 235 - 239