Brenner Base Tunnel - Construction of the Exploratory Tunnel Non-linear Stochastic Structural Analysis

被引:0
|
作者
Bergmeister, Konrad [1 ]
机构
[1] Univ Nat Resources & Appl Life Sci Vienna, Inst Konstrukt Ingn, A-1190 Vienna, Austria
关键词
D O I
10.1002/best.200800646
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Brenner Base Tunnel runs from the Innsbruck bypass, and from the Innsbruck railway station, to Fortezza/Franzensfeste and is fifty-five kilometres long. Including the Innsbruck bypass, the total length will be sixty-two point eight kilometres, meaning that this will be the longest railway tunnel in the world. It consists of two parallel tunnel tubes with an exploratory tunnel about 12 meters below them. To minimize construction risks, especially in the part to be excavated using a TBM (Tunnel Boring Machine), systematic prospecting and exploration via a tunnel are very important A TBM is currently excavating the ten-kilometer long exploratory tunnel from Aica to Maules. The tunnel will be equipped with thin concrete tubbing rings. Special monitoring equipment will also be installed. The sectional optimization of the tubbing rings, the studies in concrete technology and the appropriate areas for monitoring will be shown.
引用
收藏
页码:658 / 665
页数:8
相关论文
共 50 条
  • [1] Construction of the Brenner Base Tunnel
    Bergmeister, K.
    BAUINGENIEUR, 2010, 85 : 159 - 168
  • [2] 15 km TBM exploratory tunnel excavation in the construction Lot H33 of the Brenner Base Tunnel
    Lussu, Andrea
    Grüllich, Sebastian
    Kaiser, Christian
    Fontana, Adrian
    Geomechanik und Tunnelbau, 2019, 12 (05): : 595 - 603
  • [3] THE BRENNER BASE TUNNEL: GEOLOGICAL ISSUES FROM THE EXPLORATORY TUNNEL TO THE FINAL DESIGN
    Gattinoni, Paola
    Scesi, Laura
    16TH INTERNATIONAL MULTIDISCIPLINARY SCIENTIFIC GEOCONFERENCE, SGEM 2016: SCIENCE AND TECHNOLOGIES IN GEOLOGY, EXPLORATION AND MINING, VOL I, 2016, : 1005 - 1012
  • [4] Optimization of the structural concrete at the Brenner Base Tunnel
    Bergmeister, Konrad
    Murr, Roland
    BETON- UND STAHLBETONBAU, 2019, 114 (12) : 965 - +
  • [5] Brenner Base Tunnel
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2022, (143): : 53 - 55
  • [6] Brenner Base Tunnel
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2022, (144): : 73 - 75
  • [7] Brenner Base Tunnel
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2023, (148):
  • [8] The Brenner Base Tunnel
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2021, (138): : 65 - 66
  • [9] Brenner Base Tunnel
    不详
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2023, (145): : 40 - 42
  • [10] Brenner Base Tunnel
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2021, (139): : 73 - 74